My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/09/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 10/09/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:56:31 PM
Creation date
10/12/2018 2:50:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/09/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.5 Construction Methods <br />The existing bituminous pavement section will be reconstructed using the FDR process outlined <br />within this report. <br />4.6 Private Utilities <br />Staff has not yet met with the telephone, gas, power and cable utilities regarding this project. <br />During preparation of plans and specifications, staff will meet with the private utility companies <br />to discuss the proposed improvements as noted in the project schedule within this report. The <br />alignment and footprint of the streets will be considered to minimize impacts to private utilities. <br />No impacts to power poles or street lights are anticipated with this project. <br />Should any utility company indicate they wish to upgrade, replace and/or otherwise modify their <br />services during this project, any such upgrades, replacements and/or modifications will be at the <br />sole discretion and cost of the utility company. <br />4.7 Permits <br />Permits that are anticipated to be required as part of the proposed improvements include: <br />■ MPCA General Stormwater Permit (NPDES) Grading and Storm Water <br />A stormwater permit from the Lower Rum River Watershed Management Organization will not <br />be required with this project. <br />4.8 Right-of-Ways/Easements <br />During preparation of this report, City staff found the Ute Street cul-de-sac was constructed <br />without the necessary permanent easement. It is likely this cul-de-sac was built as a temporary <br />cul-de-sac before development to the north took place, with the intention of extending Ute Street <br />at a later date. Unfortunately the Highlands at River Park 3rd Addition did not extend Ute Street, <br />and additional right-of-way was never secured. Three properties access Ute Street including one <br />from the cul-de-sac. City staff will contact the two property owners to discuss options for <br />securing easements. The costs for easement acquisitions are not included in the probable project <br />costs. <br />City staff will obtain required right of entries on a case by case basis. <br />Feasibility Report <br />Stanhope Terrace Reconstructions <br />City of Ramsey Project No. 18-00 <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.