My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/09/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 10/09/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:56:31 PM
Creation date
10/12/2018 2:50:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/09/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br />Project B1705491 <br />August 11, 2017 <br />Page 7 <br />C. Basis for Recommendations <br />C.1. Design Details <br />C.1.a. Traffic Loads <br />Traffic counts for the streets were not available. Based on the residential zoning in the project areas, we <br />anticipate they will experience approximately 50,000 equivalent single axle loads (ESALs) over a 20-year <br />service life. <br />C.1.b. Anticipated Grade Changes <br />Based on the nature of construction, we anticipate grade changes will be minimal. <br />C.1.c. Utility Depths <br />Design utility depths were not available. We also assume storm sewer improvements will be less than <br />10 feet below grade. <br />C.1.d. Precautions Regarding Changed Information <br />We have attempted to describe our understanding of the proposed construction to the extent it was <br />reported to us by others. Depending on the extent of available information, assumptions may have been <br />made based on our experience with similar projects. If we have not correctly recorded or interpreted the <br />project details, we should be notified. New or changed information could require additional evaluation, <br />analyses and/or recommendations. <br />C.2. Design and Construction Co.1.. ations <br />C.2.a. Reuse of Pavement Materials <br />Our borings encountered a bituminous layer averaging 3 to 4 inches thick, depending on the project area. <br />The aggregate base was 5 to 5 1/2 inches thick, on average, and was underlain with sandy fill material in <br />nearly all of our soil borings. <br />In our opinion, full -depth reclamation (FDR) can be utilized in order to obtain materials for aggregate <br />base on the projects, assuming the material can be stockpiled or processed on site, or hauled to an off - <br />site location to be sorted and reused. A proper reclamation depth will likely vary be between 6 and <br />8 inches. It may be possible to increase this thickness locally depending on the conditions encountered <br />and nature of the subbase materials. <br />BRAUN <br />!RICER' LC <br />
The URL can be used to link to this page
Your browser does not support the video tag.