My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/09/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 10/09/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:56:31 PM
Creation date
10/12/2018 2:50:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/09/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2.2 City Contribution <br />The City contribution to the project will include all funding in excess of the amount <br />collected through special assessments to benefiting properties, which equals 75-percent <br />of eligible project costs. No funds have been budgeted for this project. <br />The City's share of eligible project costs related to surface (street) improvements is <br />proposed to come from the previously encumbered 5-year Street Reconstruction and <br />Overlay Program bonds. Stormwater Utility Funds are proposed to pay for all storm <br />sewer improvements. <br />Special assessments are proposed to pay back a portion of these costs based on the final <br />assessments adopted by Council at the end of the project. <br />Table 1 illustrates the proposed project funding based on the proposed design outlined <br />within this report. This funding program assumes construction will occur in 2018. <br />Estimated Costs <br />TABLE 1 <br />Proposed Project Funding <br />ASSESSMENTS CITY FUNDS TOTAL <br />$75,434.58 <br />$226,303.73 $301,738.31 <br />Total Estimated Project Cost $301,738.31 <br />Less Special Assessments (25%) - $75,434.58 <br />Subtotal = $226,303.73 <br />Less City Bonding Funds - $224,803.73 <br />Subtotal = $1,500.00 <br />Less Stormwater Utility Funds - $1,500.00 <br />Total Remaining Cost = $0 <br />Feasibility Report <br />River's Bend Street Reconstructions <br />City of Ramsey Project No. 17-02 <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.