My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 10/15/2018
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2018
>
Agenda - Environmental Policy Board - 10/15/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 11:03:43 AM
Creation date
10/15/2018 10:38:00 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
10/15/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Permits and Approvals Required <br />A listing of major approvals and public financial assistance and infrastructure <br />likely to be required by the anticipated types of development projects should be <br />given. This list will help orient reviewers to the framework that will protect <br />environmental resources. The list can also serve as a starting point for the <br />development of the implementation aspects of the mitigation plan to be developed <br />as part of the A UAR. <br />A project the magnitude of the Ramsey Town Center will require many local, regional, <br />state and federal environmental permits and approvals. This section identifies the many <br />permits and approvals that form the basis for implementation of the mitigation plan (Item <br />33). Table 8.1 lists the permits and approvals that will be needed for this project. The <br />reader should note that the need for compatibility with plans is addressed in Item 27, and <br />that brief descriptions of the permit requirements for some permits are listed after the <br />table. <br />The cost of most infrastructure improvements will be borne by the developer. The <br />County may improve the County road system as part of routine upgrades that accompany <br />traffic increases with development. There is a possibility the City will pay for some <br />infrastructure improvements, expansions or upgrades, and service enhancements that it <br />deems appropriate to provide an acceptable quality of service. A level of commitment <br />has not been determined at this time. <br />Table 8.1. Permits and Approvals <br />Unit of Government <br />City of Ramsey <br />Anoka County <br />Metropolitan Council <br />Lower Rum River WMO <br />Type of Permit <br />Site plan <br />Grading and erosion control (1) <br />Preliminary and final plat approval <br />Status <br />Pre -permit <br />review under <br />way <br />NAF * <br />NAF <br />Obstruction Permit (2) <br />Excavation Permit (3) <br />Sewer and water connection NAF <br />Building and occupancy permits NAF <br />Tree preservation NAF <br />Access via County Highway, Pre -permit <br />consistency with County standards review under <br />way <br />Sanitary sewer connection NAF <br />Grading and erosion control NAF <br />Storm sewer NAF <br />Wetland alteration (WCA) Pre -permit <br />review under <br />way <br />8-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.