My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 10/15/2018
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2018
>
Agenda - Environmental Policy Board - 10/15/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 11:03:43 AM
Creation date
10/15/2018 10:38:00 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
10/15/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
additional wells are constructed, additional appropriations <br />will be applied for through the DNR. This will most likely <br />require both short- and long-term testing and monitoring to <br />verify the above findings. Through this process, the City can <br />insure that there continue to be no impacts on groundwater <br />and surface resources due to their appropriations from the <br />FIG. <br />ITEM 14. WATER- RELATED LAND USE MANAGEMENT DISTRICT <br />ITEM MITIGATION DESCRIPTION <br />No. <br />14.1 The Ramsey 2001 Comprehensive Plan was amended in <br />2002 and contains the measures needed to effectively <br />implement resource protection for all of the resource <br />protection zones adjacent to the COR site. Although <br />Chapter XI of the Ramsey 2001 Comprehensive Plan <br />contains a thorough set of policies and related actions to <br />protect the natural character of the Critical Area, the <br />Chapter does not contain a specific provision addressing <br />control of noise in this area. The next amendments to the <br />City Plan will add a specific provision to address this <br />specific element in Executive Order 79-19. <br />2013 UPDATE 2018 UPDATE <br />The 2030 Comprehensive Plan N/A <br />addressed this issue in Chapter 11 <br />(THE MISSISSIPPI RIVER <br />CRITICAL AREA <br />CORRIDOR/MNRRA). This <br />AUAR update reflects these <br />policies from the 2030 <br />Comprehensive Plan. <br />9 Mitigation Plan Update - 2018 September 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.