Laserfiche WebLink
• Sunwood Drive at Bunker Lake Boulevard (Industry <br />Avenue). <br />• Sunwood Drive at Armstrong Boulevard. <br />• NS3 Street at Bunker Lake Boulevard (formerly <br />Industry Avenue). <br />21.4 The left turn volumes from the EW1 parkway (proposed to <br />be renamed Ramsey Parkway) onto both Armstrong and <br />Ramsey Boulevard cannot be accommodated at an <br />acceptable LOS under stop control and require signalization <br />to achieve acceptable operations. However, the close <br />spacing between the intersections of the EW1 parkway and <br />the intersections of Armstrong and Ramsey Boulevard with <br />Industry Avenue limits the potential for the two parkway <br />intersections to be signalized. Accordingly, the parkway <br />intersections should be channelized to provide right- <br />in/right-out and left -in access (3/4 access). Left out from the <br />parkway would be prohibited and would redistribute to the <br />north -south streets and to Industry Avenue (these volumes <br />have been included in the mitigated calculations for the <br />other intersections). <br />The City will continue to work on <br />this item. It has been included in <br />the City's capital improvement <br />program (CIP). <br />This item has been completed, <br />subject to final signal installation. <br />NS3 Street is proposed to be <br />changed to Center Street and this <br />portion of Industry Avenue has <br />been renamed Bunker Lake <br />Boulevard. The City will <br />continue to work on this item. <br />The City completed the <br />Preliminary Engineering Report <br />for Sunwood Drive (December 6, <br />2011) for realignment of the <br />western portion of Sunwood <br />Drive. The revisioning of The <br />COR and the creation of <br />Development Plan 5.03 (adopted <br />as part of the Comprehensive Plan <br />2011 Major Update) resulted in <br />some of the residential land in the <br />western portion of the project area <br />being converted to <br />commercial/retail in order to <br />provide a better balance of land <br />uses and respond to the current <br />marketplace. Other changes were <br />The City's five (5) year Capital <br />Improvement Program includes a <br />placeholder for a signalization <br />project for the Bunker Lake <br />Boulevard/Sunwood Drive <br />intersection in 2021, but the <br />project is currently unfunded. <br />This item has been completed. <br />NS3 Street has been changed to <br />Center Street. The City will <br />continue to work on this item. <br />These improvements have been <br />completed. <br />21 Mitigation Plan Update - 2018 September 2018 <br />