My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/16/2018
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2018
>
Agenda - Public Works Committee - 10/16/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:19:26 AM
Creation date
10/15/2018 10:54:51 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/16/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The subgrade soils in this area of the City are known to include areas of clay, which may require subgrade <br />corrections. Staff therefore ordered soil borings while developing the Feasibility Report. The results of the borings <br />were only recently submitted so Staff was still evaluating the project impacts at the time this case was prepared. <br />More information will be presented to the Committee during the meeting. <br />Preliminary project costs were previously estimated at $240,000. Based on the results of the soil borings analysis, <br />this estimate could change. Staff will address this in more detail at the meeting. <br />Staff proposes to fund the proposed improvements using a combination of special assessments to benefiting <br />properties, street reconstruction bond funds, and stormwater utility funds. <br />Improvement Project #19-02, Brookview Estates Street Reconstructions <br />Attached are Figures showing the general location of the Brookview Estates development in the northeast corner of <br />the City, as well as the overall scope of the proposed improvements. <br />The City of Ramsey's current 10-year Capital Improvement Plan (CIP) covers calendar years 2018 to 2027. The <br />plan identifies all public streets proposed to be reconstructed or to receive overlays in 2019 as part of the City's <br />long-term Street Maintenance Program. Page 223 from the CIP is attached which shows the streets in Brookview <br />Estates were proposed to receive overlays in 2019. <br />In the spring of 2018 Staff re-evaluated the pavement condition of these streets and found the pavement has <br />degraded past the point where an overlay should be applied, and that a total reconstruct is now required. Staff <br />therefore recommends that these streets be reconstructed in 2019 to allow bonds to be used to pay for the <br />improvements per the City's 2015 - 2019 Street Reconstruction and Overlay Program (SROP). <br />The streets proposed for reconstruction in 2019 within the Brookview Estates residential development include <br />about 2662 linear feet (0.50 miles) of streets including: <br />• 173rd Avenue — Germanium Street to east CDS <br />• Germanium Street — 170th Lane to north CDS <br />Attached is a street summary sheet including year of original construction, historical maintenance operations, <br />PASER rating(s), and existing pavement section data based on the Ground Penetrating Radar analysis completed <br />by Braun Intertec in 2017. In general, these streets are 39 years old and have reached the end of their useful life <br />requiring complete reconstruction. <br />The subgrade soils in this area of the City are known to include areas of clay, which may require subgrade <br />corrections. Staff therefore ordered soil borings while developing the Feasibility Report. The results of the borings <br />were only recently submitted so Staff was still evaluating the project impacts at the time this case was prepared. <br />More information will be presented to the Committee during the meeting. <br />Preliminary project costs were previously estimated at $407,000. Based on the results of the soil borings analysis, <br />this estimate may change. Staff will address this in more detail at the meeting. <br />Staff proposes to fund the proposed improvements using a combination of special assessments to benefiting <br />properties, street reconstruction bond funds, and stormwater utility funds. <br />Improvement Project #19-03, Wood Pond Hills & Chestnut Ridge Street Reconstructions <br />Attached are Figures showing the general location of the Wood Pond Hills & Chestnut Ridge developments, as well <br />as the overall scope of the proposed improvements. <br />The City of Ramsey's current 10-year Capital Improvement Plan (CIP) covers calendar years 2018 to 2027. The <br />plan identifies all public streets proposed to be reconstructed or to receive overlays in 2019 as part of the City's <br />
The URL can be used to link to this page
Your browser does not support the video tag.