long-term Street Maintenance Program. Page 223 from the CIP is attached which shows the streets in Wood Pond <br />Hills & Chestnut Ridge were proposed to receive overlays in 2019. <br />In the spring of 2018 Staff re-evaluated the pavement condition of these streets and found the pavement has <br />degraded past the point where an overlay should be applied, and that a total reconstruct is now required. Staff <br />therefore recommends that these streets be reconstructed in 2019 to allow bonds to be used to pay for the <br />improvements per the City's 2015 - 2019 Street Reconstruction and Overlay Program (SROP). <br />The streets proposed for reconstruction in 2019 within the Wood Pond Hills & Chestnut Ridge residential <br />development include about 3,310 linear feet (0.63 miles) of streets including: <br />• Krypton Street — Sunwood Drive to West plat line <br />• Krypton Street — East plat line to West CDS <br />• 146th Avenue — Nowthen Blvd/CSAH 5 to West plat line <br />• 146th Avenue — East plat line to Junkite Street <br />• Helium Street — Sunwood Drive to 146th Avenue <br />Attached is a street summary sheet including year of original construction, historical maintenance operations, <br />PASER rating(s), and existing pavement section data based on the Ground Penetrating Radar analysis completed <br />by Braun Intertec in 2017. In general, these streets are 24 - 26 years old and have reached the end of their useful <br />life requiring complete reconstruction. <br />Staff ordered soil borings while completing the Feasibility Report. The results of the borings were only recently <br />submitted so Staff was still evaluating the project impacts at the time this case was prepared. More information will <br />be presented to the Committee during the meeting. <br />Preliminary project costs were previously estimated to be $315,000. Based on the results of the soil borings <br />analysis, this estimate may change. Staff will address this in more detail at the meeting. <br />Staff proposes to fund the proposed improvements using a combination of special assessments to benefiting <br />properties, street reconstruction bond funds, and stormwater utility funds. <br />Timeframe: <br />Staff anticipates 20 minutes will be required to present this case and address questions. <br />Observations/Alternatives: <br />Staff proposes to conduct public information meetings with benefiting property owners for Improvement Project #'s <br />19-01, 19-02, and 19-03 sometime between October 23rd, the date Staff proposes to request Council approval to <br />order Public Hearings, and November 13th, the date the Public Hearings are proposed to be conducted. All <br />applicable input received at these public information meetings would be presented to Council during the Public <br />Hearings for each project on November 13th. <br />Funding Source: <br />Costs and funding sources are addressed in the background section of this case. <br />Recommendation: <br />N/A <br />Action: <br />N/A <br />Attachments <br />