My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/13/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:57:20 PM
Creation date
11/14/2018 8:53:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/13/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
760
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. CONCLUSIONS AND RECOMMENDATIONS <br />City of Ramsey Improvement Project No. 19-01 proposes to construct subgrade corrections, <br />reconstruct the bituminous pavement section, and complete miscellaneous appurtenant work on <br />the following street segments within the Ford Brook Estates residential subdivision: <br />1. 180th Lane (approx. 560 linear feet) — Trunk Highway 47 to Krypton Street. <br />2. Krypton Street (approx. 310 linear feet) — 180th Lane to south cul-de-sac. <br />It is the recommendation of City Staff that City Project No. 19-01 is feasible, necessary, and cost- <br />effective from an engineering standpoint, and this project would best be constructed as a stand- <br />alone project as proposed herein. <br />The following Staff recommendations related to the proposed project are presented for Council <br />consideration and concurrence: <br />1. Staff recommends correcting the subgrade soils by excavating 2-feet of existing <br />subgrade and replacing it with clean imported select granular material on top of <br />geotextile fabric, all at 100% City cost (non -assessable). <br />2. Staff recommends constructing new bituminous pavement per the City's standard <br />residential pavement section of 4-inches aggregate base class 5 (or reclaim), 2-inches <br />new bituminous base course, and 1 1/2"-inches new bituminous wear course. <br />3. Staff recommends expanding the Krypton Street cul-de-sac to a diameter of 100-feet. <br />4. Staff recommends excluding private irrigation system work from this project. Instead, <br />Staff will notify property owners of pending construction as far in advance as possible, <br />and instruct them to relocate their irrigation system(s) away from the construction area <br />during construction, then allow replacement in or near the original location after <br />construction is complete. <br />5. Staff recommends holding a neighborhood information meeting on November 8, 2018 <br />to inform property owners of the proposed improvements and to gather their input prior <br />to competing plans and specifications and requesting Council approval to advertise for <br />bids as outlined in the project schedule. <br />6. Order an assessment appraisal consultation to ensure special assessments do not exceed <br />the benefit received as a result of the improvements. <br />Feasibility Report <br />Ford Brook Estates Street Reconstructions <br />City of Ramsey Project No. 19-01 <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.