Laserfiche WebLink
Exhibit B <br />Engineer's Estimate <br />ci.. <br />rills,. <br />41 crcns:rlcticr. I c. <br />Lazydays of Minneapolis <br />Riverdale Drive, NW <br />Ramsey, MN <br />Attn: Eric Mass <br />Re: Lazydays of Mass Grading <br />Ramey. MN <br />1163Mandota Heights. Raid 1651)661-0266 <br />Mendota Heights. MN 55120 www.rlryan.tnnn <br />Commercial Construction I design <br />Erosion Control $12.000 <br />• install erosion control and rock entrances per plans <br />Site Clearing $6,500 <br />• Remove trees and brush <br />Mass Grading $47.000 <br />• Strip topsoil from building and parking areas <br />• Cut and fill site to grade removing excess soil from the site <br />Total: $70,500 <br />Sincerely, <br />hlike Johnson <br />Project Manager <br />