Laserfiche WebLink
Review File: Harvest Estates 2nd Addition Sketch Plan <br />November 28, 2018 <br />Page 2 of 2 <br />Lot Size <br />Lot Width <br />Lot Size Req <br />Required <br />Proposed <br />10,800 square feet <br />Doesn't meet requirement: <br />Lot 1, Block 1 - 10,536 sq. ft. <br />Remaining lots meet requirements. <br />i1 80 feet <br />Proposed 65 feet for all lots <br />Density. The R-1 MUSA regulations allow for a gross density of three (3) units per acre, or 4 units per acre <br />with a PUD. The proposed density is approximately 2.3 units per acre. <br />Landscaping. Each lot is required to have two (2) front yard trees installed. These trees may be positioned <br />in the boulevard area to serve as street trees (as spacing permits). Deciduous trees shall be at least one (1) inch <br />in diameter and coniferous trees shall be at least five (5) feet in height. Each lot will also be subject to the City's <br />topsoil requirement and this note should be included on the Landscape Plan at the time of Preliminary Plat <br />application submittal. <br />Trails. The Planning Commission and Parks and Recreation Commission will review the sketch plan and <br />provide feedback as it relates to possible trail obligations associated with the proposed development. <br />Tree Inventory. A tree inventory, prepared by an ISA Certified Arborist, shall be submitted at the time of <br />Preliminary Plat application. <br />Grading and Drainage Plans. Grading and drainage plans will need to be prepared as part of the Preliminary <br />and Final Plat submittals. A permit from the LRRWMO will be required. The Applicant will need to coordinate <br />with the City's Engineering Department regarding the application materials prior to submittal to the LRRWMO. <br />Development Fees. Development Fees will be due with the Plat including, but not limited to, Park Dedication, <br />Trail Development, and Stormwater Management. These fees are collected at the time the Final Plat is recorded <br />and at the rate in effect when the plat is recorded. <br />Development Agreement: An executed Development Agreement will be required prior to releasing the plat <br />for recording. <br />Preliminary Plat Requirements. You are required to connect with Ramsey's City Engineer to discuss <br />submittal requirements for Preliminary Plat. Please ensure that the submittal includes a geotechnical report and <br />Engineer's Estimate of required improvements. You are required to complete a Pre -Application Meeting with <br />our team. Please reach out to me to arrange this meeting as a next step. <br />Lower Rum River Watershed Management Organization. You are required to apply for a Lower Rum <br />River Watershed Management Organization Permit. You must first submit the Application to the City Engineer <br />AFTER Preliminary Plat Review by the Planning Commission. <br />