My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/22/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 02/22/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:41:25 PM
Creation date
2/18/2005 3:19:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 28, 2005 <br />Revised February 18, 2005 <br /> <br /> .15153 NoWthen Boulevard NW · Ramsey, Minnesota 55303 <br />' : ~CityHall: (763) 427-1410. Fax: (763) 427-5543 <br /> <br />Www.ci.ramsey.mn.us <br /> <br />Chris Kirchoff and Mark Nilson <br />Amcon Construction <br />1715 Yankee Doodle Road <br />Suite 200 <br />Eagan, Minnesota 55121-1616 <br /> <br />Re: Site Plan - Village Bank, <br /> <br />Dear Chris and Mark: <br /> <br />We are in receipt of a Site Plan and Building Elevation Plan prepared by Amc0n Construction <br />dated December 28, 2005. We are also in receiPt of a LandsCape Plan, Grading, Drainage and <br />Erosion Control Plan, and UtilitY Plan prepared by Hakanson Anderson dated January 4, 2005. <br />We offer the following comments..~ ~ <br /> <br />General: The site plan is proP°Sing, to develoP a 6;000 square foot banking facility on L°t 1, <br />Block 4, Rivenwick Village. TheiProperty i;s 2 acres in size (87,142 square feet). <br /> <br />Zoning: The site is currently zonedlB-2 Highway Business; Banks are a permitted use in this <br />zoning district. ' <br /> <br />Temporary Modular Structure:i On September.21, 2004, Village Bank received an interim use <br />permit to install a temporary Office structure on the subject property until such time that the <br />permanent banking facility is conStruCted. The interim use permit expires on December 31, 2005,~ <br />· however staff will be recommending that the .City Council require the removal of the temporary <br />structure within 30 days of receipt of Certificate Of Occupancy for the permanent facility. <br /> <br /> Lot Coverage: The site plan is proposin~ a 6,000 square foot building on the subject property, <br /> which equates to 7% building ~overage. The:Proposed site plan does not exceed the City's <br /> maximum lot coverage of 45%. <br /> <br />Accessory Use: Commercial or buSiness buildings and structures for a use acc,essory to the <br />principal use are permitted, but:Such use ishall not exceed 30% of the gross floor space of the <br />principal use. The site plan is not proposing anY accessory uses. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.