My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/22/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 02/22/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:41:25 PM
Creation date
2/18/2005 3:19:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey Municipal Center - Final Site Plan <br />February 18, 2005 : . . i <br />Page 4 of 5 ! <br /> <br /> is screened on all four sides, please <br /> storage area. <br /> <br />prOVide additional information regarding the waste <br /> <br />4. Additional design treatment iShoUld be giVen to the eastern elevation (Sapphire St.) than is <br /> shown. ~ <br />5. Screening with a mix of.landscaping and: decorative fencing is acceptable for the Police <br /> Department parking lot off ofiSaPPhire St. <br /> <br /> Final Site Plan submittal.· The new submittal includes a 4' high wrought-iron fence along the <br /> police parking lot along Sapphire St. which Staff believes adds great aesthetic appeal along the <br /> 'functional" and "i~tilitarian:'~ side of(he Municipal Center. The final site plan also show a <br /> trellis system along the garage faqadet for th~ growing of ivy. Staff supports this design <br /> addition and believes it will beiadd to the_appeal of the overall building design. <br /> <br />6. Further information should be: provided aboUt the composition of exterior materials that will <br /> · <br /> house the mechanical equipment located on the roOf. <br /> <br /> Final Plat Submittal: The mechanica( equiPment located on the roof will be enclosed in a <br /> structure consisting ;of metal louvered panels. The material and color will be the same as the <br /> roof structure. Staff believes that as long as the material and color are consistent with the roof <br /> structure, the structure as shown is acc~. ~table. <br /> <br />Waste Storage: City Code requires that all Solid waste and refuse receptacles be stored within a <br />completely screened structure or container. The site plan shows a screened trash enclosure located' in <br />the northeast portion of the Site. As previously mentioned, the waste storage area should be completely <br />screened on all four sides, Please verify that trUcks can access the dumpster area to empty the <br />container. <br /> <br />Lighting: Staff has receiwed information regarding -the proposed light fixtures. Once review is <br />completed, Staff will inform the Atchltect °n Whether they are acceptable. <br /> <br />Parking: The final site plan shows 4!: public parking stalls and 27 stalls for the Police Department and <br />City vehicles for a total of 68 stalls, iUnd~r the~ T°wn Center Zoning District regulations, a maximum <br />total of 187 stalls parking spaces are ~.¢quired. The Town Center Zoning District and the Town Center <br />Development Guidelines strongly encourage shared parking scenarios and the utilization of parking <br />ramps where possible. Fortunately, the City parking ramp will be adjacent to the Ramsey Municipal <br />Center. The parking ramp!will accommodate'. Parking space for approximately 800 vehicles. The <br />remaining need for parking Spaces at the ~s~y Municipal Center will be accommodated at the City <br />parking ramp. It should be noted that most City ~mPloyees will utilize the parking ramp for daily <br />parking. The parking stalls i south of the main i:ntrance to not meet the city minimums of 9 foot wide <br />stalls and 24 foot wide aisles. The plan should be changed to reflect the proper dimensions. <br /> <br />Drainage and Grading: Staff has reviewed :the final drainage and grading plans submitted for the <br />project and have the following comme'tits:: ~ - <br /> <br /> , <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.