My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/22/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 02/22/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:41:25 PM
Creation date
2/18/2005 3:19:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/18/2005 10:31 FAX 7635432699 LOGIS~ ~002 <br /> <br />Local GOVernment Information Systems Association <br /> <br />The i. oG r$ Advantage <br /> <br />Dean Busch <br />Manager of Information Technology <br />City of Ramsey <br />15/.53 Nowthen Boulevard . <br />Ramsey, FIN 55303 <br /> <br />RE: Cabling infrastructure for the new mUnldPai center. <br /> <br />Dear Dean, ' <br /> <br />This letter is in regard to our conversation abOut suPPlying the City of Ramsey with a formal quote on <br />LOGIS's labor costs on designing a~d supervising the cable plant installaUon during the building of the <br />new municipal center. : <br /> <br />After our initial discussions and reViewing thedraft building blue prints, I was able to estimate our labor <br />to perform this function for the city. i ! estimate this COst would not exceed $6,000. This estimate would <br />encompass the following items: <br /> <br /> Review of cabling needs with theiaPprOpriate city staff members, phone vendors, radio <br /> vendors, cable TV vendors, etc. <br /> - Working with the architect on building requirements, such as conduits, pathways, power, etc. <br /> Design of the computer room including locations, racking specifications, layout. <br /> - CreaUng a detailed ~bflng bid, bidding,'and evaluation of the bidders. <br /> - Overseeing,i reviewingiand managing the installation. <br /> Working with the phone, radio, QWEST and cable/audio vendors, <br /> <br />This estimate is based UPOn the LOGzs hourly network se .rvices rates, as you are aware the city will only <br />be billed for time spent On the project. HoWever LOGIS is willing to guarantee this cost will not exceed <br />$6,000. : <br /> <br />Please note: This cost only includes the cabling plant and does not include Costs for assisUng the cJW in <br />moving between facilities or replacement of hardware such as servers and switches. If you have any <br />questions, please feel free to contact me at (763) 543~2626. <br /> <br />Sincerely, <br /> <br />Kevin Pikkaraine <br />Manager of Network Services and Operations <br /> <br />CC: Heidl Nelson <br /> <br /> 5750 Duluth Street · iG°lden Valley, Minnesota 55422.4036 <br />Voice: (T63) 543.2600 · Fax: (7'63) ;43-2699 · Internet: http://www, logis, org <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.