Laserfiche WebLink
Bruce Westby, P.E. <br />February 5, 2019 <br />Page 2 of 2 <br />PROPOSED FEES <br />Bolton & Menk proposes to perform the staking based on the hours and rates presented in the following <br />table: <br />Personnel Hours Rate/Hr Total <br />Licensed Surveyor 1.0 $165.00 $ 165.00 <br />Survey Technician 8.5 $100.00 $ 850.00 <br />Survey Crew Chief 54.0 $105.00 $ 5,670.00 <br />Totals 63.5 $ 6,685.00 <br />No additional fees for stakes, mileage, equipment, etc. will be invoiced to the City, but are included in <br />our hourly rates. Additional services, if required, will be performed at the rates presented in the table <br />above. The rates above are valid through the 2019 construction season. Our 2019 Schedule of Fees is <br />attached as requested. <br />If there are any questions, please call me at (651) 968-7760. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />ATTACHMENT: 2019 Schedule of Fees <br />C:\Users\kevinki\Desktop\Ramsey 2019 Survey\Ramsey 2019 Construction Staking.docx <br />Bolton & Menk is an equal opportunity employer. <br />