My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/12/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 02/12/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:21:59 PM
Creation date
2/14/2019 3:48:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/12/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 SCHEDULE OF FEES <br />The following fee schedule is based upon <br />competent, responsible professional services <br />and is the minimum, below which adequate <br />professional standards cannot be maintained. <br />It is, therefore, to the advantage of both <br />the professional and the client that fees be <br />commensurate with the service rendered. <br />Charges are based on hours spent at hourly <br />rates in effect for the individuals performing <br />the work. The hourly rates for principals and <br />members of the staff vary according to skill <br />and experience. The current specific billing <br />rate for any individual can be provided upon <br />request. <br />The fee schedule shall apply for <br />the period through December 31, 2019. These <br />rates may be adjusted annually thereafter to <br />account for changed labor costs, inflation, or <br />changed overhead conditions. <br />These rates include labor, general business, <br />and other normal and customary expenses <br />associated with operating a professional <br />business. Unless otherwise agreed, the <br />above rates include vehicle and personal <br />expenses, mileage, telephone, survey stakes, <br />and routine expendable supplies; no separate <br />charges will be made for these activities <br />and materials. Expenses beyond the agreed <br />scope of services and non -routine expenses, <br />such as large quantities of prints, extra report <br />copies, outsourced graphics and photographic <br />reproductions, document recording fees, <br />outside professional and technical assistance, <br />and other items of this general nature will be <br />invoiced separately. Rates and charges do not <br />include sales tax, if applicable. <br />Employee Classification <br />Hourly Billing <br />Rates <br />Senior Principal $150-270/Hour <br />Principal Engineer/Surveyor/Planner/GIS/Landscape Architect $140-195 <br />Senior Engineer/Surveyor/Planner/GIS/Landscape Architect $110-175 <br />Project Manager (Inc. Survey, GIS, Landscape Architect) $100-190 <br />Project Engineer/Surveyor/Planner/Landscape Architect $85-175 <br />Design Engineer/Landscape Designer/Graduate Engineer/Surveyor $80-185 <br />Specialist (Nat. Resources; GIS; Traffic; Graphics; Other) $60-165 <br />Senior Technician (Inc. Construction, GIS, Survey') $85-175 <br />Technician (Inc. Construction, GIS, Survey') $65-140 <br />Administrative $45-100 <br />Structural/Electrical/Mechanical/Architect $120-150 <br />GPS/Robotic Survey Equipment <br />CAD/Computer Usage <br />Routine Office Supplies <br />Routine Photo Copying/Reproduction <br />Field Supplies/Survey Stakes & Equipment <br />Mileage <br />NO CHARGE <br />NO CHARGE <br />NO CHARGE <br />NO CHARGE <br />NO CHARGE <br />NO CHARGE <br />' No separate charges will be made for GPS or robotic total stations on Bolton & Menk, <br />Inc. survey assignments; the cost of this equipment is included in the rates for Survey <br />Technicians. <br />Submitted by Bolton & Menk, Inc. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.