My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/12/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 02/12/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:21:59 PM
Creation date
2/14/2019 3:48:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/12/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hakanson <br />Anderson <br />Main Office: <br />3601 Thurston Avenue, Anoka, MN 55303 <br />Phone: 763/427-5860 Fax: 763/427-0520 <br />www.haa-inc.com <br />40 <br />February 7, 2019 <br />Mr. Bruce Westby, P.E. <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />SENT VIA EMAIL: bwestby@ci.ramsey.mn.us <br />RE: Proposal for Construction Staking Services <br />City of Ramsey Projects 18-14 Riverdale Drive Sewer and Water <br />Dear Mr. Westby, <br />Thank you for the opportunity to submit a proposal for our services on the above projects. I <br />understand that the scope of our services is to provide construction staking services as needed and <br />directed for the above project. <br />Hakanson Anderson proposes to conduct this work on an hourly basis based upon the attached hourly <br />rate schedule. Each phase of the construction staking is broken down induvial below and estimated as <br />follows: <br />SCOPE OF WORK <br />• Office setup and coordination .$524.00 <br />• Verify field control and the existing conditions $1288.00 <br />• Stake Silt Fence and Removals $1654.00 <br />• Stake Sanitary Sewer $3150.00 <br />• Stake Watermain $2760.00 <br />• Stake the Storm Sewer .. $461.00 <br />• Stake Curb and Gutter $922.00 <br />• Stake Bituminous Path as needed $827.00 <br />TOTAL $11,586.00 <br />** Utility as built drawings are not included with this proposal <br />The above stated fee is based on survey control points being found in place, electronic files of <br />necessary construction documents being available for our use and a one-time staking per item. <br />Significant re -staking and services provided in addition to those proposed will be billed hourly per <br />our standard fee schedule. <br />To better serve you, we request that final plans and specifications for new projects arrive in our office <br />a minimum of five working days before staking is needed on site. After staking has started on site, a <br />two to three-day notice for return visits is requested. It is the contractor's responsibility to provide <br />shop drawings or updated plans when applicable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.