Laserfiche WebLink
1.)­³±®£´¢³¨®­  ­£ 0´±¯®²¤ <br />The AUAR study area is the 369.5-acre project known as “The COR” (formerly Ramsey Town Center) in the <br />City of Ramsey. The area is bounded by Highway 10 on the south, Armstrong Boulevard on the west and <br />Ramsey Boulevard (Highway 56) on the east (see Figure 1). <br /> <br />The Ramsey Town Center Alternative Urban Areawide Review and Mitigation Plan dated June 24, 2003, <br />(original AUAR), was adopted by the Ramsey City Council in June 24, 2003 by Resolution 2002-104. This <br />AUAR update incorporates this document by reference. <br /> <br />The preparation of this AUAR update report has been completed according to guidance prepared by the <br />Environmental Quality Board (EQB) and is based on Minnesota Rules 4410.3610, Subp. 4. <br />The mitigation items in the AUAR update follow the standard Environmental Assessment Worksheet (EAW) <br />form. When an EAW item is not applicable to this AUAR, it is so stated. Responses to the questions are only <br />provided when there has been a change since the 2003 AUAR. Whenever “no changes” is indicated, refer <br />to the original document as listed above to review the original response. <br /> <br />The 2003 AUAR included an analysis of existing conditions and the preferred development scenario. The <br />AUAR also included the progression of the conceptual designs to reach the preferred development <br />concept. The AUAR as adopted in 2003 was fully compatible with the 2001 Comprehensive Plan (as <br />amended in 2002) Land Use plan. In September 2010, the City of Ramsey prepared the 2030 <br />Comprehensive Plan Update. The land use classifications in this update were fully compatible with the <br />AUAR. <br /> <br />The 2003 AUAR is available for review on the City’s website at www.cityoframsey.com/planning-division. <br />This report is intended to serve as an update of the AUAR and includes a review of the areas that have and <br />have not developed, an update to the environmental analysis if needed and a review of the mitigation <br />measures. <br />2.!¯¯±®µ¤£ $¤µ¤«®¯¬¤­³ȝ#´±±¤­³ #®­£¨³¨®­² <br />Figure 2(Development Plan 6.0) shows the location of the approved developments within the AUAR area. <br />Of the 369.5 acres in the AUAR, 106.5 acres (738 residential units, 30.5 acres of commercial, 14.1 acres of <br />public park and numerous road improvements) were approved for development. These areas include: <br />The Ramsey Municipal Center and Parking Ramp - 5.31 acres <br />The Veterans Administration Clinic –2.34 acres <br />Allina Clinic—3 acres <br />nd <br />Ramsey Town Center 2 Addition – 103 units <br />rd <br />Ramsey Town Center 3 Addition (Northstar Marketplace retail) – 8.92 acres <br />th <br /> Addition - Symphony at Town Center—152 units <br />Ramsey Town Center 7 <br />th <br />Addition – 23 units (under construction) <br />Ramsey Town Center 8 <br />Alternative Urban Areawide Review Update 1 <br />The COR (formerly Ramsey Town Center) <br />City of Ramsey, MN <br />Landform Project No. RAM12015.000 <br /> <br />