My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 02/25/2019
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2019
>
Agenda - Environmental Policy Board - 02/25/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:30:14 PM
Creation date
2/25/2019 4:22:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
02/25/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
th <br />Ramsey Town Center 9Addition – 90 units (under construction) <br />th <br /> Addition – 44 units (under construction) <br />Ramsey Town Center 10 <br />PACT Charter School – 5.34 acres <br />NAU Country – 1.23 acres <br />COR ONE (Residence at the COR)--326 units (under construction) <br />COR TWO (Sunwood Retail) – 4.09 acres Approved) <br />COR THREE (North Commons) – 17 units (under construction) <br />Fountains of Ramsey Convention Center/Banquet Facility—3.14 acres <br />Midwest Medical Examiner’s Office—1.22 acres <br />Draw Park – 7.79 acres <br />Rhinestone Commons Park – 6.31 acres <br /> <br />The City’s 2030 Comprehensive Plan, as amended by the 2012 Comprehensive Plan Amendment (The COR) <br />(approved by the Metropolitan Council on December 12, 2012 for compliance with regional systems), <br />reflects the land uses in Development Plan 6.0, which was prepared as an update to the Preferred <br />Development Scenario from the 2003 AUAR. All of the developments that have been approved are within <br />the thresholds of the AUAR and the City’s Comprehensive Plan. <br /> <br />3.!±¤ ² 2¤¬ ¨¨¦ ³® ¡¤ $¤µ¤«®¯¤£ <br />Of the 369.05 acres in the AUAR area, approximately 215 acres remain that have not been approved for <br />development. They are shown in Figure 2 (Development Plan 6.0). <br /> <br />The development of land within The COR is dependent on market forces, but the remaining areas could <br />develop in the next 5-15 years. <br /> <br />4.5¯£ ³¤ ³® ³§¤ %µ¨±®¬¤³ « 2¤µ¨¤¶ <br />The DNR Natural Heritage Database was reviewed to provide an update for any threatened and <br />endangered species. This review and DNR correspondence is attached in Appendix B. There are no new <br />incidents of rare or endangered species within the study area. <br />The City updated the Comprehensive Sewer and Water Plans in 2012. We have reviewed the sewer and <br />water systems in relation to the existing conditions, past development and the AUAR. The City’s sewer and <br />water systems can accommodate the development proposed within the AUAR area. <br />A number of street improvements have occurred within the AUAR area. These improvements were noted <br />in the AUAR as part of the mitigation measures and are noted in this AUAR update in Section 5. <br />Stormwater Management regulations have changed since the 2003 AUAR. The Lower Rum River <br />rd <br />Watershed Management Organization (LRRWMO) adopted new rules in the “3 Generation Watershed <br />Management Plan” on January 19, 2012. A new stormwater management plan is being completed by the <br />Alternative Urban Areawide Review Update 2 <br />The COR (formerly Ramsey Town Center) <br />City of Ramsey, MN <br />Landform Project No. RAM12015.000 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.