Laserfiche WebLink
2001 Comprehensive Plan <br />Amended February 26, 2002 <br />Information included in the database would be property addresses and tax parcel <br />identification numbers, the year system installed, type of system, installers name, <br />inspection and/or pumping dates, and information from inspections and pumpings. The <br />database will help ensure that all individual septic systems are in compliance with the <br />ISTS Management Program. <br /> <br />It is expected the City will gather the necessary information for the creation of the <br />database and undertake the other steps necessary for implementation of the program <br />throughout 2001 and be ready to operate the program in January 2002. <br /> <br />D. Capital Improvement Program <br /> See Appendix G <br /> <br />Corridor Studies <br />Corridor studies area suggested as implementation strategies for resolving major <br />transportation problems on Highway 10 and with the desire for an additional bridge over <br />the Mississippi River. <br /> <br />1. Mississippi River Bridge Crossing Corridor <br />The City of Ramsey cannot solve traffic problems related to a bridge crossing by <br />itself. A consolidated effort between many entities is needed to determine the most <br />feasible, effective and environmentally sound solution to the river bridge issue. The <br />following parties will have involvement: Ramsey, Dayton, Elk River, Champlin, <br />Anoka, Anoka County, Hennepin County, MnDOT, DNR, Metropolitan Council, <br />Army Corp of Engineers, National Park Service, local citizens and environmental <br />activist groups. The City of Ramsey should work with these agencies to secure <br />funding for a study. The purpose of this study would be to determine if a bridge is <br />needed, an exact location for a future bridge, the alignment for the connecting trunk <br />highway and financing sources for design and construction. The task of "organizing <br />the effort" is all the more important in this case because of the number of agencies <br />involved and the political atmosphere. The Major River Crossings Study completed <br />by the Metropolitan Council in 1989 suggests this "study" approach to occur near the <br />year 2000. This would suggest this project to begin within the next year or so. <br /> <br />2. Highway 10 <br />A corridor study along Highway 10 would facilitate a discussion at the State level for <br />setting aside funding for the improvement of the Highway corridor to a freeway <br />design. This type of project would include: land use planning, roadway and right-of- <br />way design, fiscal/economic impact analysis, environmental review, etc... This plan <br />should be done with consideration given to the Mississippi River Bridge Crossing <br />potential. This study should also be a joint effort with the Elk River, Anoka City and <br />County and MnDOT. A study is budget by MnDOT to occur between 2001-2005. <br /> <br />2001 Ramsey Comprehensive Plan <br />Amended February 26, 2002 <br /> <br />Page XVI-4 <br /> <br /> <br />