My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/26/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 03/26/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:26:31 PM
Creation date
3/22/2019 9:22:55 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/26/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The existing storm sewer system consists of concrete catch basins that collect stormwater runoff from the curb and <br />gutter, and concrete storm sewer pipes that route the runoff to stormwater ponding areas where the runoff is stored <br />and treated. The storm sewer system was also inspected was generally found to be in good operating condition so <br />only minor maintenance work is proposed including re -grouting some structures and resetting castings. One sewer <br />pipe has a small hole near the top of the pipe, potentially caused by a boring machine while installing a private <br />utility. This hole will be inspected during construction to see if the hole requires a patch. <br />Proposed Improvements <br />All damaged concrete curb and gutter sections are proposed to be removed and replaced. <br />The existing bituminous pavement section will be reconstructed using the Full Depth Reclamation (FDR) process, <br />which involves reclaiming the existing bituminous pavement section, along with a portion of the underlying <br />aggregate base. The reclaim material generated by this process is then spread over the reshaped and compacted <br />existing aggregate base between the curb and gutter. Excess reclaim material is then removed and hauled off site to <br />allow 3'/2-inches of new bituminous pavement to be placed over the remaining compacted reclaim material. This <br />results in a 7-ton pavement design, which is the City standard for residential streets. <br />Proposed project schedule: <br />March 26 — Approve Plans and Specifications / Authorize Ads for Bids <br />March 29 & April — Publish Ads for Bids (Anoka Union Herald, Finance & Commerce) <br />May 1 — Public bid opening <br />May 14 — Accept Bids / Award Contract <br />Late May / early June — Begin construction <br />August 16 — Substantial completion (open to traffic) <br />September 10 — Order Assessment Hearing <br />October 8 — Conduct Assessment Hearing <br />Public Comment <br />Staff conducted a public information meeting on Wednesday, November 7, 2018. The purpose of the meeting was <br />to present the proposed improvements, estimated costs, funding program, and preliminary project schedule to <br />benefiting property owners, and to receive public input on the project. Property owners from 3 of the 59 identified <br />benefiting properties attended and none of the property owners generally objected to the project, and most of the <br />questions pertained to special assessments, particularly payment options. Since then, no additional public comment <br />has been received. <br />Notification: <br />Public notifications were not required in advance of this case. <br />Upon Council authorization, advertisements will be published in the Anoka Union Herald and in Finance & <br />Commerce on March 29 and April5, 2019, as required per State Statute. <br />Observations/Alternatives: <br />Observations: <br />The proposed improvements should have a serviceable life of 60 years, assuming that proactive maintenance <br />operations are performed on a regular basis during the life of the improvements. <br />Some properties may have private irrigation systems. Impacts to these systems may occur because of the proposed <br />improvements. Staff will notify property owners in writing of the pending construction as far in advance of <br />construction as possible to allow them time to move their irrigation system components away from construction <br />activities. After the project is complete, property owners may replace irrigation systems in their previous locations <br />if desired. As previously discussed, all costs to relocate private irrigation system components will be the <br />responsibility of the property owners. However, if private irrigation systems are damaged due to negligence on the <br />part of the City's contractor, the contractor will be responsible to repair the damage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.