My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/26/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 02/26/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:23:20 PM
Creation date
3/22/2019 10:45:08 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/26/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 12. WATER RESOURCES: WETLANDS <br />Item <br />No. <br />Mitigation Description <br />2013 Update <br />2018 Update <br />12.1 <br />Wetland Sequencing - Minnesota Rules 8420, also known <br />as the Wetland Conservation Act (WCA), requires specific <br />steps (sequencing) be taken when evaluating mitigation for <br />unavoidable wetland impacts. <br />This activity has occurred and <br />will continue to occur. The <br />wetland mitigation plan has been <br />modified from the original AUAR <br />concept but has been permitted in <br />compliance with WCA and this <br />AUAR update reflects those <br />changes. <br />No change. <br />12.2 <br />Stormwater Outfall to the Mississippi River: <br />• Reduce Frequency of Stormwater Discharge, Lower <br />Magnitude ofPeakFlow Rates: The project <br />incorporates a variety of strategies to lower increases <br />in stormwater rate and volume. While all stormwater <br />conveyance features are designed to accommodate <br />the 100-year runoff event without taking infiltration <br />into consideration, on -site retention and infiltration <br />can be incorporated at multiple scales into the <br />development during the detailed design phase for <br />smaller storm retention. Peak flow rates for the 100- <br />year, 24-hour runoff and 100-year, 10-day snowmelt <br />events are 25.1 cfs and 25.3 cfs respectively. <br />The City will continue to work to <br />implement this measure <br />The City will continue to work to <br />implement this measure <br />• Oversize Culvert and Reduced Slope at Outfall: The <br />last section of culvert will be enlarged from <br />2linches to 36-inches and include an apron and rip- <br />rap to lower velocities and dissipate the energy at the <br />discharge point. This will minimize the potential for <br />This item has been completed. <br />The outlet to the Mississippi <br />River was installed in 2009. <br />N/A <br />5 <br />Mitigation Plan Update - 2018 <br />November 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.