Laserfiche WebLink
Ramsey Street Inventory <br />What is a PASER? <br />AgeMilesPercent of Total Miles <br />0 – 10 12 7% <br />PASER stands for Pavement Sur- <br />11 – 20 31 17% <br />face Evaluation Rating. A PASER <br />21 – 30 44 25% <br />scale is a 1-10 rating system that <br />31 – 40 70 39% <br />uses visual inspection to evaluate <br />Greater than 40 21 12% <br />TOTAL 178 <br />City of Ramsey uses a PASER <br />rating to determine the quality of <br />PASER <br />ConditionMilesPercent of Total Miles <br />its roads. <br />Rating <br />1 - 3 Poor 14 8% <br />4 - 6 Fair 39 22% <br />7 - 10 Good 125 70% <br />Routine maintenance of <br />City streets extends the life <br />of the pavement over time <br />Pavement Lifecycle <br />- saving valued tax dollars <br />Time interval in the long run. Delaying <br />between applications <br />routine maintenance and/ <br />or overlay projects on any <br />given street will only result <br />in bigger challenges and <br />PASER Rating <br />more costly repairs in the <br />future. A newly constructed <br />road that receives routine <br />OverlayOverlay <br />maintenance and undergoes <br />two overlay projects in its <br />lifetime can last 60 years. <br />Without routine main- <br />tenance and overlays, the <br />No Maintenance <br />same road would deterio- <br />rate quickly, only lasting <br />about 20 years before need- <br />Start of <br />Age (Years) <br />ing a full reconstruct. <br />Plan <br />12 Ramsey Resident • March/April 2019 <br />