Laserfiche WebLink
CITY COUNCIL WORK SESSION <br />Topic: Ramsey Municipal Parking Facility Budget <br />By: Patrick Tmdgeon, AICP, Community Development Director <br /> <br />Background: <br /> <br />As part of the Ramsey Town Center development, the City will be constructing a parking ramp <br />adjacent to the future Ramsey Municipal Center. The City Council has previously reviewed the <br />Parking Ramp Feasibility Study which indicated that the cost ofthe ramp will not exceed $7.4 <br />Million. Staff and LSA Design have had several design review meetings to ensure that the ramp <br />stays within the budget during the past few weeks. <br /> At the regular City Council meeting to be held on March 8~, the Council will be reviewing the <br /> preliminary site plan for the Ramsey Municipal Parking Facility. The structure shown in the <br /> preliminary site plan is estimated to cost $7.246 million. This amount includes overhead and <br /> contingency. A copy of the proposed costs is attached to this topic report. <br /> <br />Staff will review the cost estimate and the design comidemtions with the Council at work session so <br />that the City Council can adequately make a determination regarding the suitability of the parking <br />ramp preliminary site plan. <br /> <br />Attachments: <br /> <br />Probable Cost o£Constmction Estimate £or Ramsey Municipal Parking Facility. <br /> <br />Action Statement: <br /> <br />No action required; for information only. <br /> <br />CCWS: 3.8.05 <br /> <br /> <br />