Laserfiche WebLink
LSA Design, Inc. <br />Probable Cost of Construction, February 22, 2005 <br /> <br />Project: Ramsey Municipal Parking Facility I Gross Area <br /> Parking Spaces 590 - 620 Cars~ 184,000~ <br /> <br />Section~ Description ' Quantity Units Total Cost/s.f. <br />0 General Conditions 1 Is $ 46'!,808.00 2.51 <br />1 Allowances for Security 1 Is $ 40,000.00 0.22! <br />2 Site Construction 1 Is $385,000.00 2.09 <br /> Clearing, grubbin~l, stripping 2.2 Acres <br /> Earthwork 12,500 CY <br /> Site concrete 235 CY <br /> Site Utilities 1 allow <br /> Bituminous Paving 146,600 SF <br /> Irrigation ' 1 allow <br /> Landscape <br /> and <br />3 Concrete 1 Is $3,264,000.00 17.74 <br /> Footings and Grade Beams <br /> Additional Footing Capacity 99,000 SF <br /> Grade walls and Retaining waIls 4060 SF <br /> Concrete Grade Slab 11,000 SF <br /> Stairs, landings, lobby, roof slafi 5,800 SF <br /> 3'-6" Bumper wall at Lvls 2 and 3 .1,340 LF <br /> 5'-0" Bumper Wall at LvI 4 670 LF <br /> P/I- supported slabs, beam, Columns ~ 134,300 SF <br /> Snow Chute 1 Is <br /> 3 Precast Concrete $610,200.00 3.32 <br /> 4'-8"x 44'Arch Pilasters 27 Ea <br /> 2'-O" x 42'Arch Pilasters 38 Ea <br /> 4-8"x 52 Arch Pilaster 4 Ea <br /> Stair/Elev Wall Panels 1,800 SF <br /> Brick Infill Panels ' 1,700 SF <br /> Brick Infill Panels at Grade 1,680 SF <br /> 4 Unit Masonry 1 Is $11,500.00 0.06 <br /> P/C Trim Units 0 Ea <br /> 8" masonry walls 1040 SF <br /> 5 Metals 1 Is $350,500.00 1.90 <br /> Metal stairs and handrails (~ NW 290 SF <br /> Metal handrails @ SW, SE & NE 690 LF <br /> Struct Steel for NW Stair Roof & Div Bras 1 Is <br /> ~,lisc. metal - 1 Is <br /> <br /> <br />