Laserfiche WebLink
PT bumper cables & fence 31,400 LF <br /> Steel Guardrai/ on bUmperwalls. 2,010 LF <br /> Canopy on Ramp 4680 SF <br /> Canopy at bus shelter 960 SF <br /> Metal Screens at Roof 605 LF <br />7 Thermal and Moisture Protection $95,900.00 0.52 <br /> Roof Membrane 1700 SF <br /> Expansion Joints and Sealants 1 allow <br /> Sea/ers 134,000 SF <br /> Traffic Membranes 1800 SF <br />8 Doors & Windows 1 Is $257,800.00 1.40 <br /> Ho#ow metal door and frame 5 Ea <br /> Steel Curtainwa// at Stair/Elev 3720 SF <br /> Roof enclosure & infi/I G/ass at Stairs 2110 SF <br />9 Finishes 1 Is $54,200.00 0.29 <br /> Paint-ramp ceilin~l 134,250 SF <br /> Paint-Stair/Elev ceilin~l 5020 SF <br /> Soffits 200 LF <br />10 Specialties $56,000.00 0.30 <br /> Monument and Arch Sign 1 allow. <br /> Wayfindin~t Si~lna~le ~ 1 allow. <br /> Bus Shelter enclosures 2 Ea. <br />14 Conveying Systems $160,000.00 0.87 <br /> 4 stop elevator 2 Ea <br />15 Mechanical $110,000.00 0.60 <br /> Draina~le - Storm 52,000 SF <br /> Draina~le - Sanita~ ' 134,500 SF <br /> Fire protection 186,500 SF <br /> Hose Bibs 16 Ea <br /> HVAC & ductwork 3520 SF <br /> Bus Shelter heaters 2 Ea <br />16 Electrical $417,500.00 2.27 <br /> Site Li~htin~ and Bus Canopy 5000 SF <br /> Li~htin~ ~184 000 SF <br /> Generator- allow 1 <br /> Is <br /> Exit Si~na~e 1 allow <br /> Feeder, Panels, Controls, Misc.p°Wer <br /> Security conduit and pwr . <br /> Subtotal $ 6,274,408.00 $ 34.10 <br /> Overhead & Profit (~ 5% $ 313,720.40 1.36 <br /> Subtotal $ 6,588,'128.40 35.46 <br /> Contingency @ 10% $ 658,812.84 3.55 <br /> Probable Cost of Construction $ 7,246,94'1.24 39.01 <br /> <br /> <br />