Mr. Jack IPpel <br /> <br />-4- <br /> <br />December 13, 1983 <br /> <br />PHASE II <br /> <br />1 1. iA! rport ZOning <br /> <br />A. Prepare Imaginary Surface Plan <br />B. Prepare Land Use Safety Zone Plan <br />C. Phepare Zoning Ordinance <br />D. COordinate with City and Reviewing Agencies <br />E. PUblic Hearing (one meeting) <br /> <br />$6,500.00 <br /> <br />TOTAL COST OF PHASE II - <br /> <br />$6,500.00 <br /> <br />SUMMARY: <br /> <br />Total <br /> <br />State Share <br /> <br />City Share <br /> <br />Phase Ia $29q,900.00 <br />Phase~Ib $4,000.00 <br /> <br />$23,920.00 $5,980.00 <br />$3,200.00 $800.00 <br /> <br /> Phase II $6,500.00 <br /> <br />Total Engineering <br />Cost - $40,400.00 <br /> <br />$5 , 200.00 $1,300.00 <br /> <br />$32,320.00 $8,080.00 <br /> <br />Phase Ia and II are not-to-exceed amounts except for Ite~ 5A. where the Aerial <br />Topography c~uld increase by $1,050.00 if a more recent topography is required. <br /> <br />Phase Ib, Public Participation is proposed to be completed on a time and <br />materials bamis,allowing for hearing preparation, attendance at hearings and <br />material costs for audio and visual display. This work will run concurrent <br />with Phase Ia. <br /> <br />There could be Some reduction in the cost of the AMP should the commission <br />members themselves volunteer to do research and/or compile data required for <br />the plap study. <br /> <br />The value ofilthis work is difficult to measure at this time wi'thout detail <br />discussion w~th the members. It is proposed that should the study be funded, <br />we could meet wi~h the commission on a regular basis to discuss the plan and <br />seek advice andgdidance in developing the final AMP. <br /> <br />The proposed,schedule of events suggests that it would take six to eight (6-8) <br />months to complelte the draft AMP. <br /> <br /> <br />