My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/28/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 05/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:29:41 PM
Creation date
6/17/2019 4:10:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/28/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
comply with applicable safety requirements, including those administered by the National <br />Highway Traffic Safety Administration (NHTSA) and Federal Motor Carrier Safety <br />Administration (FMCSA). Specifically, the application should show that vehicles <br />acquired for the proposed project will comply with applicable Federal Motor Vehicle <br />Safety Standards (FMVSS) and Federal Motor Carrier Safety Regulations (FMCSR). If <br />the vehicles may not comply, the application should either (1) show that the vehicles and <br />their proposed operations are within the scope of an exemption or wavier that has already <br />been granted by NHTSA, FMCSA, or both agencies or (2) directly address whether the <br />project will require exemptions or waivers from the FMVSS, FMCSR, or any other <br />regulation and, if the project will require exemptions or waivers, present a plan for <br />obtaining them. <br />(ii) Innovative Project Delivery <br />If an applicant plans to use innovative approaches to project delivery or is located <br />in a State with NEPA delegation authority, applicants should describe those project <br />delivery methods and how they are expected to improve the efficiency of the project <br />development or expedite project delivery. <br />If an applicant is proposing to use SEP-14 or SEP-15 (as described in section <br />E.1.i.(f) of this notice) the applicant should describe that proposal. The applicant should <br />also provide sufficient information for evaluators to confirm that the applicant's proposal <br />would meet the requirements of the specific experimental authority program.6 <br />(iii) Innovative Financing <br />6 SEP-14 information is available at https://www.fhwa.dot.gov/programadmin/contracts/sep_ <br />a.cfm. SEP-15 information is available at <br />https://www.fhwa.dot. gov/ipd/p3/toolkit/usdot/sep 15/implementation_procedure/ <br />PAGE 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.