gutter, and concrete storm sewer pipes that route the runoff to stormwater ponding areas where the runoff is stored <br />and treated. The storm sewer system was also inspected was generally found to be in good operating condition so <br />only minor maintenance work is proposed including re -grouting some structures and resetting castings. One sewer <br />pipe has a small hole near the top of the pipe, potentially caused by a boring machine while installing a private <br />utility. This hole will be inspected during construction to see if the hole requires a patch. <br />Municipal utilities (sanitary sewer and watermain) exist under each of the streets. These utilities were inspected and <br />were found to be in good operating condition so no improvements are proposed at this time. <br />Proposed Improvements <br />All damaged concrete curb and gutter sections are proposed to be removed and replaced. <br />The existing bituminous pavement section will be reconstructed using the Full Depth Reclamation (FDR) process, <br />which involves reclaiming the existing bituminous pavement section, along with a portion of the underlying <br />aggregate base. The reclaim material generated by this process is then spread over the reshaped and compacted <br />existing aggregate base between the curb and gutter. Excess reclaim material is then removed and hauled off site to <br />allow 3'/2-inches of new bituminous pavement to be placed over the remaining compacted reclaim material. This <br />results in a 7-ton pavement design, which is the City standard for residential streets. <br />Bids <br />On May 1, 2019, four (4) sealed bids were received and were publicly opened. The bids were competitive and <br />complied with the advertisement for bids. A summary of bids is below and in the attached resolution. <br />CONTRACTOR <br />TOTAL BID <br />Omann Contracting Companies, Inc. <br />$304,916.53 <br />Asphalt Surface Technologies, Corp. <br />$328,141.00 <br />North Valley, Inc. <br />— <br />$336,586.72 <br />Northwest <br />$361,974.76 <br />— <br />Engineer's Estimate <br />$267,156.35 <br />Omann Contracting Companies Inc. of Albertville, Minnesota, submitted the lowest responsible total bid of <br />$304,916.53 for constructing the proposed improvements in accordance with the approved plans and specifications <br />and advertisement for bids. This bid is $37,760.18 (14.1%) more than the engineer's estimate of $267,156.35. <br />Following award of Contract, a Notice of Award will be issued to Omann Contracting Companies, Inc. to initiate <br />execution of a contract and issuance of the required bonds and insurance. The City Attorney will verify that the <br />contract, bonds, and insurance are in proper legal form prior to execution of the contract. Once the Contract is <br />executed, staff will issue a Notice to Proceed so construction can begin. At this time, it is anticipated that <br />construction will begin in June or early July, depending on the Contractor's availability. <br />A preconstruction meeting will be held before construction begins. Staff will then mail letters to abutting property <br />owners to provide updates on the proposed construction schedule and operations based on the Contractor's input at <br />the preconstruction meeting. The letter will also contain a link to the City's web site where up-to-date information <br />can be found during construction, as well as contact information in case property owners wish to contact the <br />Contractor or City project inspector for any reason. <br />Project schedule: <br />May 14 — Accept Bids / Award Contract <br />June / early July — Begin construction <br />August 16 — Substantial completion (open to traffic) <br />September 10 — Order Assessment Hearing <br />October 8 — Conduct Assessment Hearing <br />Public Comments <br />Staff conducted a public information meeting on Wednesday, November 7, 2018. The purpose of the meeting was <br />