My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/14/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 05/14/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:29:15 PM
Creation date
6/17/2019 4:24:16 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Site Plan, Variance, and Conditional Use Permit Amendment for ACE Solid Waste <br />March 29, 2019 <br />Page 2 of 4 <br />• Reminder that a Lower Rum River Watershed Management Organization (LRRWMO) <br />permit is required before breaking ground with any activity. <br />Sheet C-901 <br />• Lighting used to illuminate the building, any signage, and/or off street parking areas shall <br />be arranged to deflect light away from adjoining public streets (Basalt St and 111' ). <br />Add note to plan sheet. <br />• Specifications for the proposed light fixtures shall be provided. Bulbs are in excess of 150 <br />watts and thus must be recessed within the fixture(s) so that the source of light (bulb) is <br />shielded from view from roads and adjacent properties. <br />Sheet G-102 <br />• Add symbol for proposed light poles. <br />Sheet L-100 <br />• It appe' s—trecc 76T�1, 786 7 -6 .,n 903 e being. ,-e ,e.a due t„ in Off of ., <br />storm water pond. If so, those can be excluded from the removal and reforestation <br />calculations. <br />due to storm water pond, total inches removed is 98 DBH inches. 70% of that is 68.6 DBH <br />inches allowed for removal; 29.1 DBH inches should be retained. 29.1 x 1.25 inches — <br />36.75 DBH inches to be replanted or 29.1 x $125 — $3,675 in restitution. Proposed <br />landscaping can be applied toward reforestation. <br />Sheet L-101 <br />• Consider utilizing a deciduous species along the western boundary rather than balsam fir <br />or northern white cedar. There is very limited space between fence and asphalt for <br />evergreens. Possibly shift them to around the storm water pond. <br />• Update Planting Schedule to identify minimum required sizes for plants. Overstory trees <br />shall be at least 2.5 inches in diameter. Coniferous trees shall be at least 6 feet in height. <br />Ornamental trees shall be at least 1.5 inches in diameter. Shrubs shall be at least 21 inches <br />in height. Minimum sizes are at time of planting. <br />• Planting requirements are 1 tree for every 1,000 square feet of building expansion and 1 <br />shrub per every 300 square feet of building expansion. Project requires 8 new trees and 27 <br />shrubs. Note though that reforestation is required due to the removal of all existing <br />significant trees on site and thus, plantings above and beyond the landscape requirements <br />will be needed (or payment of restitution per the Tree Preservation Ordinance). <br />• Use of seed rather than sod requires City Council authorization. Sod shall be used in all <br />boulevard areas (this would include all areas within ten [10] feet of public roads). <br />• Additional plantings should be included along the boundary with Basalt Street. This would <br />help `buffer' the proposed pavement encroachment in the required pavement setback from <br />road right-of-way. <br />Sheet L-102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.