Laserfiche WebLink
Review File: Site Plan, Variance, and Conditional Use Permit Amendment for ACE Solid Waste <br />March 29, 2019 <br />Page 3 of 4 <br />• Update Deciduous Tree Planting detail to specify removal of twine, cut or fold back burlap, <br />and remove top 1/3 of wire basket. <br />• Irrigation system must be equipped with a rain sensor and some form of water efficient <br />technology such as a weather based smart controller. Update Irrigation Notes accordingly. <br />• City requires a two (2) year maintenance guarantee for all new plantings. <br />Staff provides the following comments for general review of applications: <br />General. The project proposes an 8,066 square foot addition to an existing transfer station facility <br />as well as new off-street parking and maneuvering areas to be accessed from 141st Ave. There are <br />also applications to amend the existing Conditional Use Permit (CUP) to account for the expansion <br />of a conditional use and a variance to deviate from the minimum parking and/or maneuvering area <br />from public right-of-way. <br />Zoning. The property is zoned E-2 Employment R-1 Residential (Rural Developing) and is guided <br />as Business Park in the Comprehensive Plan. Per City Code Section 117-427 (Solid Waste), a <br />Conditional Use Permit is required for storage, collection, and transportation of solid waste. The <br />City approved a Conditional Use Permit (Resolution #00-04-104 <br />Streets and Access. The transfer station will now have access from 141st Ave. Trucks will enter <br />the site traveling south, dump materials within the facility, then continue south and exit onto <br />McKinley Street. <br />Off -Street Parking and Maneuvering Areas. Off-street parking and maneuvering areas are <br />required to be setback from public rights -of -way at least twenty (20) feet. The project proposes to <br />add another eleven (11) parking stalls for the waste -hauling trucks along the eastern property <br />boundary. The pavement and curb/gutter are proposed to be six (6) feet from the right-of-way <br />boundary along Basalt Street and the concrete pad for the "convenience center" is proposed to be <br />ten (10) feet from the right-of-way boundary along 141st Ave. The submittal does include a request <br />for a variance to the twenty (20) foot greenspace requirement. <br />Exterior Finish Materials. The building addition is proposed to consist of the same exterior <br />finish as the exiting structure. This includes `raked' precast panels with a two (2) foot tall smooth, <br />painted bed. <br />Building Coverage. Building coverage is limited to no more than forty-five percent (45%) in the <br />E-2 Employment District. The total lot area is 442,403 square feet and with the proposed addition <br />of 8,066 square feet, there will be a total of 36,032 square feet of building coverage. This equates <br />to roughly eight percent (8%) of building coverage overall on the property. <br />Development Agreement: An executed Development Agreement will be required prior to <br />commencing construction. The primary purpose of the Development Agreement will be to <br />memorialize the responsibilities, approved plans, and required surety and inspection fees. <br />