My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/22/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 03/22/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:46:16 PM
Creation date
3/18/2005 11:51:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASES <br /> <br />Phase I (2005) - Phase One °fthe prOject includes the following components: <br /> <br />(1) Ramsey BoUlevard is imProved to a four lane divided highway from T.H. 10 to <br /> 1,000 feet north °fBu~ker L~ke Boulevard.. This project includes signal <br /> modifications at T.I-I. ~ 0 and railroad crossing upgrades (signal and surface). <br />(2) A full traffic: actuated signal i~ installed at Ramsey Boulevard and Bunker Lake <br /> Boulevard and at RamSey :Bbfllevard and Sunwood Drive with fight and left turn <br /> lanes as required for all approaches to the intersection. <br />(3) Turn lanes: (both left and righi) will be added on Bunker Lake Boulevard at Town <br /> Center Driv~e. <br /> <br />(4) Left turn lane s as: required for south bound traffic and a right turn lane for north <br /> bOund traffi0 will be added on Armstrong Boulevard at Sunwood Drive. <br /> <br />(5) Several citY streets will be constructed south of Bunker Lake Boulevard. <br />Phase II (_2006.) <br /> <br />(1) Armstrong BouleVard is reconstructed from T.H. 10 to 1,000 feet north of <br /> Bunker Lake BOUlevard:to a fOur lane divided roadway. This project includes <br /> signal modifications at T]H. i1~0 and railroad crossing upgrades (signal and <br /> surface). <br />(2) Full traffic actuated sisal sYs~tems would be installed at the intersections of <br />Bunker Lake BouleVa?d and Armstrong Boulevard, and at Armstrong Boulevard <br />and Sunwo°d Drive. All signals on Bunker Lake Boulevard shall be <br />interconnected With an interconnect system compatible with other County <br />interconneC~s. <br />Phase III (2007) <br /> <br />(1) Bunker La1~ Boulevard is reconstructed to a four lane divided roadway from <br /> Armstrong Boulevard ~o 1,000 feet east of Ramsey Boulevard. <br /> <br />(2) Full traffic actuated signal systems would be installed at the intersection of <br /> Bunker Lake Boulevard andTown Center Drive, Bunker Lake Boulevard at <br /> Sunfish Lake Boulevard. All signals on Bunker Lake Boulevard shall be <br /> interconnected with art interCOnnect system compatible with other County <br /> interconnects. <br /> The County will consider th~ addition of a full traffic actuated signal system at <br /> the intersection of Bunker Lake Boulevard and Sunwood Drive following receipt <br /> of additionalltraffic information to justify said signal system. <br /> <br />(3) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.