Laserfiche WebLink
Schedule C - Trunk Storm ~Sewer imprOvements & Outfall to River <br /> <br />Item <br /> <br />2. <br />3. <br />4. <br />5. <br /> <br /> Description Extension <br /> Jack 60" Casing ' '$78i000.00 <br /> Jack 48" RCP ;$126,000.00 <br /> 48" Carrier Pipe $13~760.00 <br /> 42" RC Pipe Sewer Design 3006 GL Iff. $219600.00 <br /> 48" RC Pipe Sewer Design 3~)06 CLIII :$13;760.00 <br /> ~ $434;000.00 <br /> $3;200.00 <br /> $15~200.00 <br /> $5;000.00 <br /> : $12;000.00 <br /> $254;250.00 <br /> i$169}200.00 <br /> $3;000.00 <br /> Subtotal: $~1,148;970.00 <br />OVERItEAD & CONTINGENCY 35%: ~$402,1;39.50 <br /> <br />6. Jack 42" RCP <br />7. 42" FES <br />8. 48" FES <br />9. 42" Outlet Structure <br />10. Skimmer Structure <br />11. Pond Liner <br />12. Sand Cushion <br />13. Storm Manhole <br /> <br />$0 <br /> <br />Subtotal C - Trunk Storm Sewer Costs: $1,551,109.50 <br /> <br />MAXIMUM TOTAL COUNTY PARTICIPATION: <br /> <br />$4,581,500 <br /> <br /> <br />