Laserfiche WebLink
~ ~: =~' CASE# <br /> <br /> CONSIDER LIGHTiPOLE AND B~NER ARM SPECIFICATIONS <br /> By: ,LeOnard ~inton Civil Engineer II <br /> <br />Background: <br /> <br />The Strectscap¢ plan that w~ submitted does not include banners on the light poles <br />within the Ramsey Town C~ter but iS. taft ~feels that we need to plan for the future <br />enhancement of the streets~l~e plan:(o~incl,fide the ability to install banner arms and <br />banners on Sunwood Drive from ~sti:6ng Boulevard to Ramsey Boulevard. <br /> <br />Information on the banner ns waSpresent~d at the March Public Works Committee <br />meeting and the case is attac .h~.'. They~ecommended providing inserts in the poles at 8.5 <br />and 12.5 feet above the grotmd, i The~full 60tmcil needs to approve the change before <br />Connexus will order the poles. <br /> <br />Normally this case would be included in the Public Works report that is presented at the <br />first council meeting of the n~onth, hOWeVer ithere is an 8-12 week delivery time after the <br />order is placed. This action ia being b/,ouglitlforward to expedite the process so that the <br />order can be placed. Connexus will begin installing the poles after they arrive. <br /> <br />Council Action: <br /> <br />Motion to recommend that there be tw° inserts included in each of the poles that are <br />ordered for Sunwood Drive l~ated etS!5 feet',and 12.5 from the elevation of the ground. <br /> <br />Reviewed by: : <br /> <br />Assistant Public Works Director/PrinciPal city Engineer <br /> <br />CC: 3/22/05 <br /> <br /> <br />