My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/22/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 03/22/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:46:16 PM
Creation date
3/18/2005 11:51:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSIDER AUTHORIZe, ~NG:BIDI~ iFO~ MUNICIPAL CENTER PROJECT <br /> By: Held! ~. :NeiJohi Ags~t. City Administrator <br /> <br />Background: <br /> <br /> The design for the Municipal Center project is!nearing completion, with the production o£ <br />construction documents occurring by'~he endo~ MUrala, 2005. The project will then be ready for the <br />bidding process beginning in early April 2005. !The COmponents to be included in the complete bid <br />package are as follows: site, architeefgral~ mechanical, electrical, security, and technology. Plans and <br />specifications have been prepared by BKV GroUP; In6~ 3D/I will manage the bid process for the site, <br />architectural, mechanical, electrical, '.ar3d security.. L01GIS will provide plans and specifications and <br />manage the bidding for the technologY3 comPoffent. The bidding period is scheduled to begin on April <br />8th, 2005 with the bid date established as May ~th, 20015. Bid opening is scheduled for May 5th, 2005 at <br />2:00 p.m. at Fire Station No. 1 for theBKV/3D/IbidiPackage. The technology package will be bid <br />during the same period by the LOGIS °rganizationwi;~h the bid opening occurring on May 5t~, 2005 at <br />2:00 p.m. at Fire Station No. 1. ' <br /> <br /> The Municipal Center project:~is a 68,000 squgi;e foot city hall and police facility; the cost <br />estimate for the project based upon t~a Design DeVe!gpment phase is $16,668,159. Once the 95% <br />construction documents are reviewedi ihe budggt wiilibe revised as needed. Once bids are received, <br />the project cost wilt be presented to C:ounCil, at!Whic~ time, the contracts could be authorized to <br />proceed with the construction. Staff~ticipate~ prese~ating the contracts to the Council at their regular <br /> Ill r <br />meeting of May 24 , 2005. additio lly, ;:he ~ssUance of the Lease Revenue Bonds will be presented <br />to Council for authorization~ at the regfilar meeting of May 24th, 2005. <br /> <br />Staff Recommendation: <br /> Authorize BKV Group, Inc. a~.d 3D/I to Proee,ed with the bidding process for the City of <br />Ramsey Municipal Center ConstructiOn projectl <br /> <br />Council Action: <br /> Approve Resolution No. 05-03 , AuthlOrizint the bidding process for the City of Ramsey <br />Municipal Center Project. <br /> <br />Reviewed by: <br />City Administrator <br />Finance Officer <br /> <br />CC: 03/22/2005 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.