ESTIMATED COSTS <br /> <br />A detailed itemization of project costs is presented in Appendix C. These costs have been <br />aggregated into the four s~arate categories. Sanitary Sewer and Watermain Service <br />Extension costs include 'thOSe Costs aSsociated with the extension of sanitary utilities in <br />order to provide service to ipr°perti~s: currently without them. These costs include the <br />removal of existing pavement and. the_ restoration of the class 5 and bituminous base <br />course through the portion Of the project which would be-disturbed by the installation of <br />these utilities. Waterrnain lOoping co,Sm include the northerly extension of the watermain <br />a distance of 650 feet fi*om the watermain Service extension'area through its connection to <br />the existing main on Kiv¢rdale: Drive. !This watermain looping includes the costs <br />associated with pavement removal Md, restOration caused by its installation similar to the <br />sewer and watermain service benefited area. <br /> <br />FINANCING <br /> <br />This project anticipates utilizinga nUmberiof financing sources. The cost of the sanitary <br />sewer and lateral watermain which will Provide service to those lots which do not <br />currently have these sanita~ services available will be assessed the total cost identified as <br />Sanitary Sewer and Watermain - Service Extension identified in Appendix C. These <br />costs include the removal of the existing pavement and the replacement of the bituminous <br />base course through the sOutherlY 40~ feet Of Ebony Street. It is proposed that these costs <br />be distributed among the benefited Propeaies baSed upon front footage. The.looping of <br />the watermain to Riverdaie Drive provides !he benefit of increased flexibility to the entire <br />water distribution system.: These costs are identified aS Watermain - Looping in <br />Appendix C. It is proposed that these.cOsts iwould be funded by the city utility trunk fund. <br /> <br />The cost of the Sidewalk shall be COmPletely funded by the city through 'the use of the <br />city trail fund. The cost .of the Ccincre[ei curb and gutter shall be assessed 100% to <br />properties which will benefit from the. sewer and water improvements, Since this <br />improvement has 'a history Of being assOCiated With these city utilities. The remaining <br />properties shall have the ci~st of the ,conCrete curb and gutter assessed 50% of its total <br />cost. It is proposed that 50% of the' cost' of the bituminous overlay improvements be <br />assessed based upon front footage t9 all property owners and that the remaining 50 % be <br />financed by the City General fund. ,This is consistent with the policy associates with the <br />annual street maintenance program. ,A sUmmary of the project costs is presented below: <br /> <br /> <br />