Laserfiche WebLink
Len LintonLen LintonLen LintonLen LintonLen LintonLen LintonLen LintonLen Linton <br />05/24/2019 9:29 AM05/24/2019 9:29 AM05/24/2019 9:29 AM05/24/2019 9:29 AM05/24/2019 9:25 AM05/24/2019 9:25 AM05/24/2019 9:25 AM05/24/2019 9:25 AM <br />page for each BMP. These sheets inserted ahead of this use the Project description represents ie. 2019 buildout, Need at least one soil boring in each basin. Boring must extend at least <br /> 5 feet below Surface elevations must be Watermain serviing multilpe Consider alternate location for water service if building will be expanded in this area designers do not like to <br /> build Verify Hydrant distance from <br />Include the BMP definition <br />to indicate what each run <br />over existing watermains. <br />will need to be separate <br />the bottom of the basin. <br />Watermain must be 8". <br />on plan datum, not an in the future. Building <br />hydrants must be 8". <br />building with Fire <br />ultimate buildout. <br />assumed datum. <br />Department. <br />summary. <br />Consider alternate location <br />Verify Hydrant distance <br />Pond data Required <br />Surface Elevation <br />Infiltration basins <br />for water service <br />Watermain sizeWatermain size <br />Label <br />LLLLLLLLLLLLLLLL <br />15358_Delta ModTech Stormwater 15358_Delta ModTech Stormwater 15358_Delta ModTech Stormwater 15358_Delta ModTech Stormwater <br />Management Report.pdfManagement Report.pdfManagement Report.pdfManagement Report.pdf <br />C8.pdfC8.pdfC8.pdfC8.pdf <br /> <br />