Laserfiche WebLink
Eric Maass <br />Len LintonLen LintonLen Linton <br />05/24/2019 9:27 AM05/24/2019 9:27 AM05/24/2019 9:27 AM05/21/2019 3:00 PM <br />Swale appears to be 0.3%. This is too flat to grade. The grade of the swale must be increased to 2.0% minimum. This is the CIty minimum for This comment applies to all grass areas <br /> outsde of ponds.A Construction Stormwater be provided so that the pond can be cleaned in the future.Remove the ghosted future Additionally, this would not be approved as ghosted in <br /> as it would result in a large <br />waters within 1 mile of site.the Mississippi River. Site <br />This site is within 1 mile of shown on preliminary plat. <br />A pond access route must <br />The SWPPP must include: <br />commercial/industrial lots <br />after construction ceases. <br />A full SWPPP is required. <br />permit is required for this <br />commence within 7 days <br />Map showing impacted <br />construction stormwter <br />All requirements of the <br />Inspection information. <br />Notice of Termination <br />stabiliazation must <br />SWPPP designer <br />land locked lot. <br />grass areas. <br />information. <br />information <br />permit. <br />site. <br />Changemark #01 <br />Pond access <br />Swale slope <br />SWPPP <br />EM <br />LLLLLL <br />C6.pdfC6.pdfC6.pdfC1.pdf <br /> <br />