Laserfiche WebLink
Joe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe Feriancek <br />05/14/2019 3:30 PM05/15/2019 7:28 AM05/15/2019 7:28 AM05/15/2019 7:28 AM05/15/2019 7:28 AM05/15/2019 7:28 AM05/15/2019 7:28 AM05/15/2019 7:28 AM <br />Standard Details which can be found on the city website 8" PVC Sanitary and 8" DIP Water have been stubbed to the property. Sanitary Stub is north out of manhole near Follow City Standard <br /> Detail This would also require a full width street patch matching 12" Cl. 5, 2" non wear, 3.5" Trail driveway crossings will ramps. the ramps will not be domes, but must meet slope <br /> requirements. An individual detail of each ped ramp will <br />If tying into manhole, must required to have truncated <br />Call out how connection is <br />0.1' drop across structures <br />the existing bunker lake <br />require ADA pedestrian <br />Update invert elevations <br />Use all applicable City <br />-> Engineering Page. <br />boulevard section. <br />western entrance. <br />ERO-3 Rip Rap. <br />being made. <br />be required. <br />core-drill. <br />wear. <br />Sanitary & Watermain Stubs <br />Tie into existing sanitary <br />Connect to existing <br />Standard Details <br />Structure Drops <br />Trail Crossings <br />Key Note 7 <br />FES 4 & 5 <br />manhole <br />JJFJJFJJFJJFJJFJJFJJFJJF <br />C9.pdfC8.pdfC8.pdfC8.pdfC8.pdfC8.pdfC8.pdfC8.pdf <br />Engineering Tech - Engineering Tech - Engineering Tech - Engineering Tech - Engineering Tech - Engineering Tech - Engineering Tech - Engineering Tech - <br /> <br />