My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 08/27/2019
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2019
>
Agenda - Council Work Session - 08/27/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:33:00 PM
Creation date
8/29/2019 2:13:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
08/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Firm: <br />City of Ramsey Public Works and Fleet Maintenance Facility <br />Evaluation No. 1 <br />Proposal Ranking Form <br />Suggested Scoring Guidelines <br />Outstanding 75% to 100% of Maximum Points <br />Exceeds/ Acceptable 50% to 75% of Maximum Points <br />Acceptable 25% to 50% of Maximum Points <br />Marginal 0% to 25% of Maximum Points <br />Maximum Points Score <br />Understanding of Services Required: <br />Firm indicates an understanding of the services <br />required for this project and identifies special <br />project requirements in their proposal and schedule. <br />1. Personnel: <br />Based upon resumes of key staff, project managers <br />and project engineers, firm appears to have experience <br />in preparing a construction management plan <br />for designing and constructing public works facilities. <br />2. Firm Experience: <br />Firm appears to have applicable experience in preparing <br />preliminary design reports and contract documents in <br />similar size public works projects. <br />3. Performance and References: <br />Firm appears to be able to perform the project <br />in a timely and cost effective manner. The proposal <br />included references to be contacted. <br />4. Proposal: <br />Information provided in the proposal is complete, <br />organized and presented in a professional manner. <br />Technical Proposal Total Points: <br />Technical Proposal Ranking: <br />25 <br />25 <br />25 <br />20 <br />5 <br />100 <br />Ranked by: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.