My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 08/27/2019
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2019
>
Agenda - Council Work Session - 08/27/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:33:00 PM
Creation date
8/29/2019 2:13:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
08/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIILr <br />WRIGHT COUNTY HIGHWAY DEPARTMENT FACILITY <br />Buffalo, MN <br />105,963 SF new highway department facility and site <br />work. The facility includes a 10-bay maintenance shop, <br />vehicle storage, conference rooms, administration and <br />support area, office space, and a vehicle wash. <br />• Fleet Maintenance Shop (37,703 SF) <br />- 10 maintenance bays with glass panels in the overhead <br />doors to provide natural light to the space. <br />- In -floor heating throughout the entire space with a <br />high -efficient boiler. <br />- Energy recovery system to preheat the fresh air during <br />winter. <br />- An inside car washbay with an automatic underbody <br />washing system. <br />- A lube/fluids system with enough space for 9 <br />permanent tanks and space for 55 gallon drums with <br />recessed in -floor containment. The system also has an <br />automatic shut-off valve that prevents leaks during off <br />hours. <br />- A 5-ton bridge crane with access to the mezzanine <br />storage space. <br />- A welding bay with a bridge crane. <br />- A small engine room. <br />- A sign shop and parts room. <br />- LED lighting. <br />• Vehicle Storage (54,620 SF) <br />- 49 parking stalls (17 large truck parking, 16 snow plow <br />parking, 16 semi -truck or truck with trailer parking). <br />- Snow plow parking has a storage shelf running the <br />length of the space that can store plows and empty <br />brine tanks when not attached to the trucks. There is <br />also added coray-vac heating to quickly melt ice and <br />snow off the plows. <br />- Chemical storage room with a recessed floor for built-in <br />containment. <br />- Engineering and testing room which allows the County <br />to perform in-house soil testing and analysis. <br />- Secure small tool storage to store hand tools, with work <br />benches for quick repairs. <br />- LED lighting throughout the space. <br />D. SIMILAR PROJECTS <br />• Office Area (totaling 12,640 SF) <br />- 10 permanent offices around the exterior with large <br />floor -to -ceiling interior glass windows to let natural light <br />into the interior of the office space. <br />- 10 workstations with flexible space including large <br />cabinets for plan storage, countertops to act as <br />tables for quick document review, and impromptu <br />collaboration space. <br />- 2 large conference rooms. <br />- Kitchenette/coffee bar. <br />- Instead of wall -mounted fin tube radiation, in -slab <br />heating was used around the office perimeter freeing <br />up wall space and making the space more flexible <br />- Large breakroom/meeting space that can be divided <br />into 3 smaller spaces, each with a kitchenette and their <br />own audio visual, or function as one space if all spaces <br />are open. <br />- Locker rooms with 70 lockers, showers, and washer/ <br />dryer. <br />- A wainscot of bumished exposed aggregate block was <br />installed throughout the office area that is durable and <br />functional, yet provides aesthetic interest. <br />- LED lighting. <br />VALUE ENGINEERING SOLUTIONS - PROVIDING SAVINGS <br />TO WRIGHT COUNTY: <br />• Rough grade of site to pad ready: Saved $20k <br />• Providing Class 5 for contractor to place: Saved $40k <br />-$45k <br />• Bidding the asphalt paving with Wright County's road <br />work contract: Saved $115k - $120K <br />Delivery Type: CMa <br />Services Provided: preconstruction and construction <br />Start: 8/15 Scheduled Comp: 7/16 1 Actual Comp: 7/16 <br />Const. Budget: $1 6,100,000 I Final Contract: $15,939,346 <br />Ramsey Public Works and Fleet Maintenance Facility <br />City of Ramsey, MN <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.