My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 08/27/2019
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2019
>
Agenda - Council Work Session - 08/27/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:33:00 PM
Creation date
8/29/2019 2:13:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
08/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAKE COUNTY HIGHWAY DEPARTMENT FACILITY <br />Two Harbors, MN <br />Lake County just celebrated their grand opening for <br />the new Highway Department Facility. KA built the <br />53,873 SF new facility on a 20-acre site. <br />53,873 SF, two-story Main Maintenance/Office Building <br />• 22,100 SF vehicle storage area includes 26 parking <br />spots for cars, trucks, plows, graders, and end <br />loaders, sign storage, and soils lab <br />• 12,610 SF vehicle repair/storage/wash area <br />includes 3 maintenance/repair bays, 1 wash bay, <br />and 1 welding bay, tool room, and parts room <br />• 8,763 SF administrative area includes offices, <br />breakroom, training room, locker rooms, and <br />support spaces <br />• 5,500 SF mezzanine <br />• 4,900 SF 2nd floor unfinished future office <br />Project Challenge <br />The project had a challenging start requiring major <br />soils corrections, and a delay with the pre -cast <br />concrete wall panels. KA worked closely with the <br />entire project team to address this. The project was <br />successfully delivered to meet the Owner's schedule. <br />Delivery Type: CMa <br />Services Provided: preconstruction and construction <br />Start: 1/18 I Scheduled Comp: 3/19 I Actual Comp: 3/19 <br />Const. Budget: $8,000,000 I Final Contract: $7,892,000 <br />VALUE ENGINEERING SOLUTIONS - PROVIDING SAVINGS <br />TO LAKE COUNTY: <br />• Owner to provide parking lot bituminous paving: Saved <br />$298,000 <br />• Owner to provide all granular fill and Class 5: Saved <br />$149,000 <br />• Eliminate onsite fencing and gates: <br />Saved $71,000 <br />Ramsey Public Works and Fleet Maintenance Facility <br />City of Ramsey, MN <br />D. SIMILAR PROJECTS <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.