My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/10/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 09/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:33:33 PM
Creation date
9/11/2019 4:04:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/10/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
834
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Completed Improvements <br />The original bituminous pavement and aggregate base sections were removed and hauled off site. Two -feet of <br />unsuitable existing clay subgrade material was also removed and hauled off site. Geotextile fabric was placed on <br />the bottom of the shaped and compacted subgrade, then drain tile was installed along the outer edges of the fabric. <br />Two -feet of compacted select granular borrow (sand) was then placed on top of the fabric and drain tile, and the <br />drain tile was connected to a storm sewer structure allowing for positive drainage of the subgrade at low points. <br />Four -inches of imported aggregate base was then placed and compacted on top of the select granular borrow, <br />followed by 3'/2-inches of new bituminous pavement. The new pavement section provides a 7-ton pavement design, <br />the City standard for residential streets. <br />Ditches were graded after the pavement section was complete and the necessary driveway culverts were replaced. <br />The culvert crossing 180th Lane was replaced, and a storm manhole was added to the middle of the culvert crossing <br />so the drain tile could be connected to the storm sewer system. A swale was also graded across the southeast corner <br />of the property north of 18Cth Lane and west of Truck Highway 47 to prevent runoff from the ditch from traversing <br />across the property, which had no drainage easement. <br />Construction was substantially complete by mid -July. The proposed improvements are anticipated to have a <br />serviceable life of 60 years, assuming proactive maintenance operations are performed on a regular basis over the <br />life of the improvements. <br />Public Comment <br />Staff conducted a public information meeting for this project on Thursday, November 8, 2018, to present the <br />proposed improvements, estimated costs, funding program, and preliminary project schedule to benefiting property <br />owners, and to receive public input on the project. Property owners from 3 of 8 identified benefiting properties <br />attended. None of the owners objected to the project. Most questions pertained to special assessments and the <br />reasoning behind the School Districts request to expand the cul-de-sac. <br />The residents questioned why the School District asked the City to expand the cul-de-sac now, noting that they see <br />buses stopping on Highway 47 in other locations. The property owners did not formally object to expanding the <br />cul-de-sac, they just didn't understand why this request was being made now as they said they had asked the <br />School District to pick up and drop off kids in the cul-de-sac years ago when there were far more kids in the <br />neighborhood, yet their request was denied. Now there are fewer kids in the neighborhood and they asked if other <br />options are available. <br />A property owner in attendance at the Public Hearing in November again questioned why the School District <br />wanted to enlarge the cul-de-sac. Staff has contacted the School District numerous times since and has received the <br />same answer each time. The School District confirms that buses will not be allowed to stop in dedicated turn lanes <br />on Highway 47 and will need to turn onto 180th Lane to pick up and drop off kids starting this fall, and will <br />therefore need the cul-de-sac expanded so buses can turn around. <br />Per City Council direction, the cul-de-sac was expanded to accommodate the School District's request. Per the <br />City's Special Assessments Policy, costs to expand streets are ineligible for assessments so the costs to expand the <br />cul-de-sac will be paid in full by the City. <br />Notification: <br />Following Council approval, an Assessment Hearing Notice will be published in the City's official newspaper on <br />Friday, September 20, 2019. Assessment Hearing Notices will also be mailed to all benefiting property owners as <br />required per State Statute. <br />Anoka County requires that assessments be certified to the County Auditor by November 15, 2019 for collection on <br />next year's (2020) taxes. November 15, 2019 will therefore be the last day that assessed property owners can <br />prepay their special assessments without paying interest. Conducting the Assessment Hearing at the regular City <br />Council meeting on October 8, 2019, will allow more than 30 days for mailing the required assessment notices to <br />property owners. <br />