Laserfiche WebLink
Kevin Young, PE <br />Project Engineer <br />8+ years of experience <br />Kevin has served as a water treatment plant operator, engineer and <br />supervisor at a 10 mgd lime softening facility for Moorhead Public Service <br />(MPS). His operations experience also includes ozone disinfection, <br />biological filtration, chlorination and high service pumping. Kevin will <br />provide the day to day process engineering for layout of the plant and <br />site. Like John, Kevin holds a Minnesota Class A water operator's license <br />in addition to his Bachelor's and Master's degrees in Civil Engineering. <br />Kristin Petersen, <br />AICP, NCI, LEED AP° <br />Public Engagement <br />Specialist <br />13+ years of experience <br />Kristin is an AICP certified planner and is the senior design engagement <br />lead at SEH. Her background is focused on identifying and managing <br />community concerns and conflicts and documenting, writing and providing <br />graphic design for the preparation of project planning reports. Kristin will <br />organize and lead the Public Outreach program with Chris Larson. <br />Chad Westbrook, PE <br />Electrical Engineer <br />23+ years of experience <br />Chad is an electrical engineer with technical experience that includes <br />facility power distribution and generation systems; fire alarm detection <br />and notification; communication systems; and security systems. Chad will <br />lead the electrical and control system design. For the Preliminary Design <br />Study, this work will be important for appropriate sizing of the electrical <br />and control spaces and developing an accurate cost estimate of the <br />planned facility. <br />Nick Brula, PE <br />Mechanical Engineer <br />15+ years of experience <br />Nick has extensive experience in energy analysis/modeling and ASHRAE <br />90.1 appendix G. He is experienced in every phase of HVAC project <br />development, including initial cost estimation, facility analysis, system <br />design and construction administration. Nick will be responsible for <br />the mechanical system layout and space needs assessment for the <br />mechanical and HVAC systsms. Like Chad, Nick's early input during the <br />Preliminary Design Report will assure that the mechanical spaces are <br />sized correctly and the facility cost estimate is accurate. <br />SEH's Pilot Study Trailer <br />SHORT ELLIOTT HENDRICKSON INC. 13 <br />