My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 04/16/2002
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2002
>
Minutes - Public Works Committee - 04/16/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:30:18 AM
Creation date
5/12/2003 2:13:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
04/16/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the driveway as it entered into the Ramsey Professional Buildings property. He stated that the <br />owners of the Ramsey Professional Building are upset because they had a direct access from the <br />highway and now they have to go through another buildings parking lot to enter their building. <br /> <br />City Attorney Goodrich stated that the reason the City should be considering whether or not to <br />proceed with the transaction is to acquire property that might be necessary in the future. <br /> <br />Councilmember Kurak expressed concern with a frontage road being constructed over a <br />cesspool. <br /> <br />City Engineer Jankowski replied that the cesspool is located northwest of the parking lot and <br />fairly close to the building so it would not be near the frontage road. <br /> <br />Councilmember Kurak stated that she doesn't like the idea of doing anything before they know <br />what will happen to Highway #10, but they will need a frontage road as it tums into an <br />expressway so they will need to acquire the property anyway. <br /> <br />Councilmember Zimmerman inquired if the City were to acquire the land for a frontage road and <br />the highway department decided they needed another 20 feet it would be a prime area for them to <br />take it. He inquired as to how wide the frontage road would be. <br /> <br />Principal Engineer Olson replied that the width would be 30 feet. <br /> <br />Councilmember Zimmerman inquired if the highway department were to decide to expand the <br />highway would the City still have room for a frontage road. <br /> <br />Principal City Engineer Olson replied that the highway department would have to make room to <br />relocate the frontage road. <br /> <br />Councilmember Zimmerman stated that he would like to know from the highway department as <br />to how much right of way they will need. <br /> <br />Principal Engineer Olson replied that until it is determined what type of road will be going <br />through they will not know how much right of way will be needed. <br /> <br />Councilmember Zimmerman stated that the City should keep track of how much funds they are <br />spending on Highway #10 issues. <br /> <br />Councilmember Hendriksen inquired as to what the driving need was for extending sewer and <br />water to the Ramsey Professional Building. <br /> <br />City Engineer Jankowski replied that the objective was to provide sewer and water to the Ramsey <br />Professional Building and to the western boundary of the property for future development. <br /> <br />Public Works Committee/April 16, 2002 <br /> Page 3 of 12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.