My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 01/28/2020
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2020
>
Agenda - Council Work Session - 01/28/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:21:34 AM
Creation date
1/30/2020 10:59:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
01/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 3: Deliverable = Project Completion September 1, 2020 —August 31, 2021 <br />Phase 3: Task A • Construction Administration / Observation <br />Schedule: Twelve (12) Months (Verify with CM) September 1, 2020 — August 31, 2021 <br />Work Scope: <br />• Attend regular construction meetings and review work for compliance with construction documents. <br />• Review shop drawings and product submittals. <br />• Answer all contractor inquiries regarding the design intent of the documents (RFI's / ASI's). <br />• Issue contract modification documents as required (Proposal Requests, Project Directives). <br />• Work closely with the Construction Manager regarding the construction work. <br />• Review payment applications and prepare change orders. <br />• Review the completed project 11 months after the date of occupancy and report any issues or warranty <br />problems to the Construction Manager for correction. <br />Design Team Staff Involvement / Roles Primary Responsibilities <br />• Architectural <br />Dan Lind— Principal Architect / PM <br />Dan Lawrence — Project Architect <br />• Civil / Landscape <br />Civil Engineer(s) <br />• Structural <br />Structural Engineer(s) <br />• Mechanical & Electrical <br />Mechanical Engineer(s) <br />Electrical Engineer(s) <br />City of Ramsey Team Responsibilities: <br />• Payment of Approved Applications for Payment. <br />• Attendance at Construction Meetings. <br />• Approval of required changes. <br />Deliverables: <br />• Timely review of Submittals and Shop Drawings. <br />• Review of Pay Applications with the Construction Manager and the City of Ramsey. <br />• Issuance of appropriate Change Orders. <br />• Punch list Inspections in coordination with the Construction Manager and the City of Ramsey. <br />• 11 Month Post -Construction Warranty Review. <br />Construction Observation / Quality Control <br />Construction Observation / Quality Control <br />Construction Observation <br />Construction Observation <br />Construction Observation <br />Construction Observation <br />City of Woodbury Public Works - Woodbury, MN <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.