My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/11/2020 - Joint CC & Planning
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2020
>
Agenda - Council Work Session - 02/11/2020 - Joint CC & Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:23:19 AM
Creation date
2/10/2020 12:07:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Title
Joint CC & Planning
Document Date
02/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />December 18, 2019 <br />Mr. Bruce Westby, P.E. <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />RE: Proposal for Engineering Services <br />Puma Street Improvement Project <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />Dear Mr. Westby: <br />We appreciate the opportunity to present this scope of services for the Puma Street Improvement project. <br />Our scope and fees were prepared based on our understanding of the project and our previous experience <br />in delivering State Aid projects. <br />The following proposal is based on our December 13, 2019 discussion related to the project as well as the <br />Future Business Park study and the recently constructed Bunker Lake Boulevard and Puma Street <br />Improvements project. <br />SCOPE <br />The improvements will be generally as described in our December 3, 2015 report for the Future Business <br />Park. The phasing will be as generally described in our March 2017 Update Report. The improvements <br />will consist of the following items as presented in the above reports, depicted on the attached figures, and <br />as constructed in 2018: <br />• Puma Street construction will include the Phase 2 area identified in the Business Park Study <br />Update, which includes street and utility improvements from the Puma Street lift station to Alpine <br />Drive. <br />• A 10-foot bituminous trail will be constructed along the west side of Puma Street. <br />• 10-inch sanitary sewer and 16-inch watermain will extend the entire length of the project. <br />• The Alpine Drive and Puma Street intersection will be relocated to line up with Okapi Street NW. <br />Project scope assumptions used in creating this fee proposal include the following: <br />• A full topographic survey was previously completed. Only verification survey is required. <br />• The Developer will design the storm pond and provide an easement to the City. We will <br />coordinate discharge of the street stormwater into this pond. <br />• No additional turn lanes will be added to Alpine Drive at this time. Additional development and <br />traffic may warrant turn lanes in the future. <br />• The Right -of -Way plat for the road realignment will be provided by the City. <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.