My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/11/2020 - Joint CC & Planning
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2020
>
Agenda - Council Work Session - 02/11/2020 - Joint CC & Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:23:19 AM
Creation date
2/10/2020 12:07:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Title
Joint CC & Planning
Document Date
02/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bruce Westby, P.E. <br />December 18, 2019 <br />Page 2 of 3 <br />• State Aid formatted plans, including plan review checklist and spread calculations are required. <br />• Street lighting will be completed separately by the City. <br />• Geotechnical borings will extend 5-feet below the anticipated sanitary sewer depth. <br />• The anticipated plan set will include the following 34 sheets: <br />o Title (1 sheet) <br />o Legend (1 sheet) <br />o Details & MnDOT Standard Plan Sheets (10 sheets) <br />o Tables & SEQ (3 sheets) <br />o Existing Conditions & Removals (1 sheet) <br />o Erosion Control Plan & SWPPP (5 sheets) <br />o Traffic Control Plan (1 sheet) <br />o Sanitary Sewer & Water Plan & Profiles (2 sheets) <br />o Street & Storm Sewer Plan & Profiles (2 sheets) <br />o Storm Sewer Leads (1 sheet) <br />o Intersection Detail (1 sheet) <br />o Signage & Striping (1 sheet) <br />o Cross -Sections (5 sheets) <br />Construction costs associated with the improvements described above are estimated at approximately <br />$990,000, which includes a 10 percent construction contingency. We will create a detailed engineer's <br />estimate based on actual design quantities. <br />SCHEDULE Schedule has changed and will be updated based on discussion. <br />The proposed schedule for these improvements is as follows: <br />Task Date <br />City Council Action (Authorize Plans) <br />City Council Approves Plans and Orders Bids <br />Public Bid Opening <br />City Council Accepts Bids / Awards Contracts <br />Begin Construction <br />Substantial Completion <br />Final Completion <br />PERMITTING AND APPROVALS <br />January 14, 2020 <br />February 25, 2020 <br />March 31, 2020 <br />April 14, 2020 <br />May 18, 2020 <br />September 18, 2020 <br />October 23, 2020 <br />The work associated with the roadway improvements will require the following permits: <br />• State Aid Approvals <br />• Lower Rum River Watershed Management Organization (Stormwater and Erosion Control) <br />• MPCA (NPDES — Construction Stormwater General Permit) <br />• MPCA (Sanitary Sewer Extension Permit) <br />• MDH (Watermain Installation Permit) <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.