Laserfiche WebLink
COST BREAKDOWN <br />FOR TWE ENGINEERING AND ASSOCIATED COSTS FOR <br />WELLS NO. 7 AND 8 <br /> CITY OF RAMSEY, MINNESOTA <br /> <br />Task 1 - Construction of Test Well <br />A. Construction of Test Well <br /> Cost Estimate <br />Item No. Est. # Units Unit Price Total Price <br /> <br />Description <br />Mobil./Demobil, <br /> <br />1 1 LS $1,500.00 <br />2 Drill 8.5" dia. Borehole 200 ft. $12.00/ft. 2,400.00 <br />3 200 ft. $8.00/ft. 1,600.00 <br /> <br />6 <br />7 <br /> <br />10 <br /> <br />11 <br /> <br />Set 4" dia. Casing <br />F & I Neat Cement Grout <br /> <br />Drill 4" Open Hole <br /> <br />F.I.R. Test Pump Equip. <br />Test Pumping <br />Water Analysis <br />Gamma Log & Report <br />Clean Up & Cap <br />Electronic Loggers <br /> <br />50 bags . <br />200 ft. <br /> <br />$15.00/yd. <br /> <br />$10.00/ft. <br /> <br />$300.00/ea. <br /> <br />750.00 <br /> <br />2,000.00 <br /> <br />300.00 <br /> <br />4 hr. $I00.00fnr. 400.00 <br />1 ea. $1,100/each 1,100.00 <br />I ea. 1,100.00 <br /> <br />$1,100.OOfhr. <br />$200.00/hr. <br /> <br /> I 200.00 <br /> 1 $2,500/ea. 2,500.00 <br />Total Co~s ~r Construction of TestWell $13,850.00 <br /> <br />Engineering <br /> <br />Prepare specifications and <br />coordination with DNR, MDH <br />and other agencies <br />On-site coordination and <br />observation during monitoring <br />well construction <br /> <br />40 hrs. <br /> <br />40 hrs. <br /> <br /> Total Engineering Costs <br />Total Costs for Task 1 <br /> <br />$3,000.00 <br /> <br />3,000.00 <br /> <br />$6,000,00 <br /> <br />$19,85o.oo <br /> <br />Task 2 - Water Supply Wells and Pump~ Wells No. 7 and No. 8 <br /> 1. Coordination with DNR, MDH I 60 hrs. <br /> and other agencies <br /> I <br /> 2. Prepare. P & S for wells 100 hrs. <br /> 3. Bidding services 16 hrs. <br /> 4. Construction engineering services 80 hrs. <br /> I Total Cost Task 2 <br />Task 3 - Well ]louse No. 4 <br /> 1. Coordination with DNR, MDH [ 8 hrs. <br /> and other agencies <br /> I <br /> 2. P[epare P & S for well house 160 hrs. <br /> 3. Bidding services 10 hrs. <br /> 4. Construction engineering services 80 hrs. <br /> Total Cost Task 3 <br /> <br />$3,000.00 <br /> <br />10,000.00 <br /> 1,000.00 <br />12,000.00 <br /> <br />$23,000.00 <br /> <br />$500.00 <br /> <br />I6,000.00 <br /> t,000.00 <br /> 6,000.00 <br /> <br />.... .$23~000.00 <br /> <br />Task 4 - Interconnecting Watermain 1. Coordination with DNR, MDH <br /> and other agencies <br /> 2. Prepare? & S for watermain <br /> 3. Bidding services <br /> 4. Construction engineering services <br /> Total Cost Task 4 <br /> <br />I8 hrs. <br /> <br /> 60 hrs. <br /> 10 hrs. <br /> 80 hrs. <br /> <br />$500.00 <br /> <br />4,500.00 <br />1,000.00 <br />6,000.0O <br /> <br />....... $12~000.00 <br /> <br />GSramsey\Cost Breakdown-Wells No 7-8.doc <br /> <br /> <br />