My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/12/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 04/12/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:47:09 PM
Creation date
4/8/2005 3:21:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/12/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brian Olson, City of Ramsey <br />February 9, 2005 <br />Page 2 of 2 <br /> <br />Task 4 -Interconnecting Watermain Between Well No. 8 and Well No. 7 Pump House <br />In this task, we would perform the following major items: 1) provide engineering documents to secure a <br />qualified contractor to install the interconnecting watermams and associated road work and obtain <br />approval from MDH, DNR and other agencies; 2) coordinate and assist the City staff in processing and <br />obtaining all necessary permits; 3) perform bidding services; 4) provide the necessary construction <br />engineering and periodic construction observation services during the construction of the interconnecting <br />watermains along with the associated road work to ensure the facility is constructed a¢¢ordhag to the plans <br />and specifications; 5) coordinate and assist the City in reviewing the watermain/road work contractor <br />payment requests; and 6) coordinate with the watermain/road work contractor to ensure all as-built <br />drawings are provided. <br /> <br />2the costs to perform the tasks described above would be the not-to-exceed amounts presented below: <br /> <br />Task 1 (Conseruction of Test Well) <br />Task 2 (Water Supply Wells and Pump Well No. 7 and No. 8) <br />Task 3 (Well House No. 4) <br />Task 4 (/nterconnect/on of Watermain) <br />Total Estimated Costs <br /> <br />$19,850 <br />$23,000 <br />$23,000 <br />$12,000 <br /> <br />$77,850 <br /> <br />Only the actual costs incurred to perform the work would be billed. A more detailed cost breakdown is <br />attached for your review. <br /> <br />We would proceed with the work as soon as we receive approval from the City, and complete the work <br />within the City's time schedule. <br /> <br />If you have any questions or need further information, please call me at 507-6254171. Thank you! <br /> <br />Sincerely, <br /> <br /> BOLTQN & MENK, INC. <br /> <br />//~6fi D. Peterson, P.E. <br />Associate Engineer <br /> <br />JDP:jp <br /> <br />cc: Robert M. Brown, P.E., Bolton & Menk, Inc. <br /> <br />G:~ amscy\OlsonLT4-Well No 7-8.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.